Clearwater River Coho Salmon Production Project X

Salmonid Hatcheries and Harvest Management

Fish Marking Hatchery Production
Project ID10-NezP-1
Recovery DomainsWillamette River, Snake River
Start Date03/01/2011
End Date06/30/2015
Year2010
StatusCompleted
Last Edited05/08/2024
 
1 - 1

Description    


The Clearwater River Coho Salmon Production X continued the coho salmon reintroduction work in the Clearwater subbasin begun by the previous nine projects. This PCSRF project is solely a portion of the larger Nez Perce Tribe Clearwater River Coho Salmon Production Project (CRCSPP) that seeks to restore a localized coho salmon stock capable of enduring the migration to the Clearwater River subbasin to population levels sufficient to support a sustainable run capable of annual harvest.

This project (Phase VIII) conducted work at four worksites:

Worksite #1: Dworshak National Fish Hatchery (DNFH) – Trapped 132 returning coho adults and used as broodstock to provide eggs for the coho hatchery production groups. In addition, 61,287 coho were marked with Coded Wire Tags. When the smolts had reached optimum growth levels, they were transported to Kooskia NFH for acclimation and release. Egg to smolt rearing was funded by other sources and was not part of this project.

Worksite #2: Eagle Creek National Fish Hatchery (ECNFH) - Marked 60,000 smolts with Coded Wire Tags and transported 176,886 smolts to Lapwai Creek and 211,626 smolts to Kooskia NFH for acclimation and release. Egg (from DNFH and Lapwai Creek) to smolt rearing was funded by other sources and was not part of this project.

Worksite #3: Kooskia National Fish Hatchery (KNFH) – Trapped 420 coho adults and used as broodstock to provide eggs for all of the coho hatchery production groups. Incubated and acclimatized 528,346 coho smolts from DNFH and ECNFH and pit tagged 4,987of the smolts. Of the surviving coho smolts, released 316,720 coho smolts directly into Clear Creek next to Kooskia National Fish Hatchery.

Worksite #4: Lapwai Creek – Trapped 384 coho adults and used as broodstock to provide eggs for all of the coho hatchery production groups. Acclimated and released 176,886 smolts from ECNFH.

Project Benefit    


The goal of the project is to restore adult returns in the Clearwater River to support natural production as well as tribal and non-tribal harvest. The Nez Perce Tribe believe a population of 5,000 to 15,000 adults can meet the production and harvest goals; the long-term goal is 14,000 as identified in Wy-Kan-Ush-Mi-Wa-Kish-Wit (CRITFC 1996). In addition, this project expands the range of Coho in the Columbia River Basin into Snake River tributaries. Natural production of Coho salmon has been documented in Lapwai and Lolo Creek (tributaries to the Clearwater River) and the Tucannon River (tributary to the Snake River) as a result of the Clearwater River Coho Salmon Production Project releases.

Coho were extirpated in the Snake River basin by 1984; in the Clearwater as early as 1927 when Lewiston Dam was constructed (now removed). Clearwater Coho restoration began in 1995 and has continued with release of eggs, parr and smolts. In general, the smolt release goal ranges from 830,000 to 1.1 million annually through cooperative production supported by Tribal, State and Federal managers under U.S. v. Oregon. In 2009, adult returns reached a new high of 4,910 Coho documented over Lower Granite Dam. This continued level of adult returns provides localized broodstock which is one of the major goals of the Master Plan (2004) and reduces reliance on Lower Columbia River broodstock for recovery.

Accomplishments

Metric Completed Originally
Proposed
Hatchery Fish Marked
  Fry/Smolt Marked And Released 126,274 125,000

Funding Details

SourceFunds
PCSRF$372,938
Other$262,835
Report Total:$635,773


Project Map



Worksites

Dworshak Fish Hatchery    


  • Worksite Identifier: Dworshak Fish Hatchery
  • Start Date: 10/01/2010
  • End Date: 06/30/2015
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Clearwater (170603)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 46.502144
  • Longitude: -116.322361

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Fall Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 227,938.00
    •      . . D.0.b
      Complement habitat restoration project
      Lapwai Restoration Plan
    •      . . D.0.c
      Project Identified in a plan or watershed assessment.
      Clearwater Coho Master Plan (Nez Perce Tribe and Fish pro 2004), Wy-Kan-Ush-Mi Wa-Kush-Wit, Spirit of the Salmon: Volume I:5B-14-22; Volume II: 2-118-127 (CRITFC: Nez Perce, Umatilla, Warm Springs and Yakama Tribes 1995).
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding 220,000.00
      •      . . . . D.1.e.1 Native/wild broodstock collection/relocationY (Y/N)
        •      . . . . . . D.1.e.2 Number by species of broodstock collected (LOV)
      •      . . D.2 Fish Marking ProjectY (Y/N)
        •      . . . . D.2.a Fish Marking Funding 7,938.00
        •      . . . . D.2.b.1 Salmonids Marked and Released.Y (Y/N)
          •      . . . . . . D.2.b.2 Number by species of fry/smolt marked or tagged and released (LOV)
          •      . . . . . . D.2.b.3 Pupose of marking/tagging (LOV)

Lapwai Creek    


  • Worksite Identifier: Lapwai Creek
  • Start Date: 10/01/2010
  • End Date: 06/30/2015
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Clearwater (170603)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 46.443539
  • Longitude: -116.814778

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 60,000.00
    •      . . D.0.b
      Complement habitat restoration project
      none
    •      . . D.0.c
      Project Identified in a plan or watershed assessment.
      Clearwater Coho Master Plan (Nez Perce Tribe and Fish pro 2004), Wy-Kan-Ush-Mi Wa-Kush-Wit, Spirit of the Salmon: Volume I:5B-14-22; Volume II: 2-118-127 (CRITFC: Nez Perce, Umatilla, Warm Springs and Yakama Tribes 1995).
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding 60,000.00
      •      . . . . D.1.b.1 Salmonids Reared/ReleasedY (Y/N)
        •      . . . . . . D.1.b.2 Number by species of Salmonids Reared/Released (LOV)
        •      . . . . . . D.1.b.3 Purpose Of Production/Release (LOV)
      •      . . . . D.1.e.1 Native/wild broodstock collection/relocationY (Y/N)
        •      . . . . . . D.1.e.2 Number by species of broodstock collected (LOV)

Eagle National Fish Hatchery    


  • Worksite Identifier: Eagle National Fish Hatchery
  • Start Date: 10/01/2010
  • End Date: 06/30/2015
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Willamette (170900)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Willamette River
  • Latitude: 45.276014
  • Longitude: -122.202489

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 247,835.00
    •      . . D.0.b
      Complement habitat restoration project
      Lapwai Restoration Plan
    •      . . D.0.c
      Project Identified in a plan or watershed assessment.
      Clearwater Coho Master Plan (Nez Perce Tribe and Fish pro 2004), Wy-Kan-Ush-Mi Wa-Kush-Wit, Spirit of the Salmon: Volume I:5B-14-22; Volume II: 2-118-127 (CRITFC: Nez Perce, Umatilla, Warm Springs and Yakama Tribes 1995).
    •      . . D.2 Fish Marking ProjectY (Y/N)
      •      . . . . D.2.a Fish Marking Funding 247,835.00
      •      . . . . D.2.b.1 Salmonids Marked and Released.Y (Y/N)
        •      . . . . . . D.2.b.2 Number by species of fry/smolt marked or tagged and released (LOV)
        •      . . . . . . D.2.b.3 Pupose of marking/tagging (LOV)

Kooskia National Fish Hatchery    


  • Worksite Identifier: Kooskia National Fish Hatchery
  • Start Date: 10/01/2010
  • End Date: 06/30/2015
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Clearwater (170603)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 46.129839
  • Longitude: -115.946922

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 100,000.00
    •      . . D.0.b
      Complement habitat restoration project
      none
    •      . . D.0.c
      Project Identified in a plan or watershed assessment.
      Clearwater Coho Master Plan (Nez Perce Tribe and Fish pro 2004), Wy-Kan-Ush-Mi Wa-Kush-Wit, Spirit of the Salmon: Volume I:5B-14-22; Volume II: 2-118-127 (CRITFC: Nez Perce, Umatilla, Warm Springs and Yakama Tribes 1995).
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding 99,000.00
      •      . . . . D.1.b.1 Salmonids Reared/ReleasedY (Y/N)
        •      . . . . . . D.1.b.2 Number by species of Salmonids Reared/Released (LOV)
        •      . . . . . . D.1.b.3 Purpose Of Production/Release (LOV)
      •      . . . . D.1.e.1 Native/wild broodstock collection/relocationY (Y/N)
        •      . . . . . . D.1.e.2 Number by species of broodstock collected (LOV)
      •      . . D.2 Fish Marking ProjectY (Y/N)
        •      . . . . D.2.a Fish Marking Funding 1,000.00
        •      . . . . D.2.b.1 Salmonids Marked and Released.Y (Y/N)
          •      . . . . . . D.2.b.2 Number by species of fry/smolt marked or tagged and released (LOV)
          •      . . . . . . D.2.b.3 Pupose of marking/tagging (LOV)