Dutch Flat Dam Removal
Salmonid Restoration Planning and Assessments
|
054 78 CW Mul | Snake River | 07/07/2010 | 06/30/2012 | 2007 | Completed | 01/14/2025 | |
| |
Description
Survey work at the project site was completed and analyzed. Soil samples were taken and analyzed for hazardous materials. Engineering designs were presented to the City of Troy, permitting agencies, and funding entities. The final designs were presented to the City of Troy for approval and go ahead to seek funding of dam removal. Funding proposals were prepared for PCSRF round #14 and the funding decision is pending at the time of this writing. Fish distribution and abundance surveys have been conducted above and below the projects site. Flow gaging stations have been established below the project site and photo point locations have been identified.
Project Benefit
Removal of the Dutch Flat Dam would allow wild steelhead migration access to a watershed area of approximately 7,600 acres which encompasses approximately 35 stream miles.
Funding Details |
PCSRF | $27,963 |
Other | $19,740 |
Report Total: | $47,703 |
|
| |
Worksites
Dutch Flat Dam
- Worksite Identifier: Dutch Flat Dam
- Start Date: 07/07/2010
- End Date: 06/30/2012
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Clearwater (170603)
- Subbasin: Clearwater (17060306)
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 46.742871
- Longitude: -116.785274
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 47,702.00
- . . B.0.b.1
Area Encompassed 10.0
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 47,702.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
J.K. Johnson. 2011. Troy Dam Fish Passage Troy, Idaho.K35 Resources LLC, Portland, Oregon. Prepared for Latah SWCD. |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
The engineering work included development of plan alternatives and analysis to restore Snake River steelhead passage at Troy Dam upstream of Troy, ID on the West Fork Little Bear Creek and safe removal of accumulated sediment above the dam. An estimated project cost was included |
|
|