Salmon Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project ID06MAK03
Recovery DomainsOzette Lake
Start Date07/01/2007
End Date12/31/2008
Year2006
StatusCompleted
Last Edited01/31/2024
 
1 - 1

Description    


In a joint project involving the Lower Elwha Tribe and Washington Department of Natural Resources, we installed several engineered log jams in the upper Hoko River. A bridge spanning Ellis Creek, a tributary to the Hoko River, was removed in the summer of 2008 and replaced with a channel-spanning LWD jam. More wood was placed upstream of the confluence with the Hoko River to improve habitat complexity and increase aggradation of salmon spawning gravels. The wood we put in place has reactivated historical floodplain habitat, stabilized river banks by minimizing erosion, and has promoted channel bed scour that creates deep pools utilized by rearing juveniles.

The Tribe maintained an existing log jam project in an eroding incised channel for bank stabilization and habitat enhancement. This effort required the removal of several pieces that had dislodged from the main structure to prevent scour activity from undercutting a steep bank along a residential property. Staff also conducted cross-sectional surveys of the Big River stream channel as well as a tributary, Boe Creek, a major tributary of the Big River that supports fry emergence and smolt development of hatchery-origin sockeye salmon.

Project Benefit    


Riparian habitat restoration contributes to recovery of aquatic ecosystems within the Makah U&A by conducting reforestation projects. Improved habitat conditions should improve productivity and recovery of regional salmonid populations. Monitoring conditions pre- and post- project completion will evaluate the efficacy of project design toward achieving desired results and lead to better designed projects in the future. Work performed in conjunction with other projects to produce more complete results is an effective use of available funds.

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated .50 .66
  Acres Treated 12.0 10.0

Funding Details

SourceFunds
PCSRF$120,548
Report Total:$120,548


Project Map



Worksites

Big River    


  • Worksite Identifier: Big River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Ozette Lake
  • Latitude: 48.16084
  • Longitude: -124.546411

ESU

  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS
  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .50
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Monitoring of pre- and post-project instream and riparian habitat conditions will be conducted to measure success of habitat restoration efforts. In general, monitoring may include one or more of the following: measurements of LWD and jam density; pool conditions; habitat unit area and frequency; canopy density and riparian condition; permanent reference/photo points; permanent cross-sections; channel profile surveys; substrate size distribution data; fish presence/absence surveys; redd count surveys; discharge and velocity measurements; water quality characteristics.
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.b Total length of instream habitat treated .00
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .00
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.b.1 Total riparian miles streambank treated .50
        •      . . . . C.5.b.2 Total Riparian Acres Treated 2.0
        •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
          •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control .0

20093618    


  • Worksite Identifier: 20093618
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.274251
  • Longitude: -124.634063

ESU

  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS
  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Monitoring of pre- and post-project instream and riparian habitat conditions will be conducted to measure success of habitat restoration efforts. In general, monitoring may include one or more of the following: measurements of LWD and jam density; pool conditions; habitat unit area and frequency; canopy density and riparian condition; permanent reference/photo points; permanent cross-sections; channel profile surveys; substrate size distribution data; fish presence/absence surveys; redd count surveys; discharge and velocity measurements; water quality characteristics.
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.b.1 Total riparian miles streambank treated .00
      •      . . . . C.5.b.2 Total Riparian Acres Treated .0
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control .0

Hoko River    


  • Worksite Identifier: Hoko River
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Puget Sound (171100)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.149249
  • Longitude: -124.354846

ESU

  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS
  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .05
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Monitoring of pre- and post-project instream and riparian habitat conditions will be conducted to measure success of habitat restoration efforts. In general, monitoring may include one or more of the following: measurements of LWD and jam density; pool conditions; habitat unit area and frequency; canopy density and riparian condition; permanent reference/photo points; permanent cross-sections; channel profile surveys; substrate size distribution data; fish presence/absence surveys; redd count surveys; discharge and velocity measurements; water quality characteristics.
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.b Total length of instream habitat treated .00
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .05
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.b.1 Total riparian miles streambank treated .00
        •      . . . . C.5.b.2 Total Riparian Acres Treated 5.0
        •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
          •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control .0

Sooes River Reforestation    


  • Worksite Identifier: Sooes River Reforestation
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain:
  • Latitude: 48.274251
  • Longitude: -124.634063

ESU

  • Olympic Peninsula Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Olympic Peninsula Steelhead DPS
  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .11
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Monitoring of pre- and post-project instream and riparian habitat conditions will be conducted to measure success of habitat restoration efforts. In general, monitoring may include one or more of the following: measurements of LWD and jam density; pool conditions; habitat unit area and frequency; canopy density and riparian condition; permanent reference/photo points; permanent cross-sections; channel profile surveys; substrate size distribution data; fish presence/absence surveys; redd count surveys; discharge and velocity measurements; water quality characteristics.
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.b.1 Total riparian miles streambank treated .00
      •      . . . . C.5.b.2 Total Riparian Acres Treated 5.0
      •      . . . . C.5.c.1 Riparian plantingY (Y/N)