Grand Ronde Tribes Fish Passage Projects

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID2480555
Recovery DomainsWillamette River
Start Date07/01/2001
End Date09/30/2002
Year2001
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


The Confederated Tribes of Grand Ronde improved fish passage to Upper Willamette ESU steelhead by removing or replacing four problem culverts with embedded round and pipe arch culverts. All assessment and design planning will follow the guidelines and meet the criteria of the Oregon Road-Stream Crossing Restoration Guide: Spring 1999 (Robison et al. 1999) referred to in the Oregon Aquatic Habitat Restoration and Enhancement Guide, May 1999.

Project Benefit    


Access to over 6 miles of Upper Willamette ESU steelhead habitat will be improved.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 4.50 4.00

Funding Details

SourceFunds
PCSRF$118,750
Report Total:$118,750


Project Map



Worksites

181    


  • Worksite Identifier: 181
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Willamette (170900)
  • Subbasin: Yamhill
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Willamette River
  • Latitude: 45.1311585332237
  • Longitude: -123.638848844411

ESU

  • Upper Willamette River Chinook Salmon ESU
  • Upper Willamette River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 118,750.00
    •      . . C.0.b Length of stream treated/protected 6.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      none
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.0.d.3
      Monitoring text (from Phase I)
      Project sites will be inspected for compliance with design specifications after completion and again after first high flows.
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 118,750.00
      •      . . . . C.2.b.1 Length of stream made accessible 4.50
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 4
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 4
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 4.50