Grand Ronde Tribes Fish Passage Projects
Salmonid Habitat Restoration and Acquisition
|
2480555 | Willamette River | 07/01/2001 | 09/30/2002 | 2001 | Completed | 01/26/2024 | |
| |
Description
The Confederated Tribes of Grand Ronde improved fish passage to Upper Willamette ESU steelhead by removing or replacing four problem culverts with embedded round and pipe arch culverts. All assessment and design planning will follow the guidelines and meet the criteria of the Oregon Road-Stream Crossing Restoration Guide: Spring 1999 (Robison et al. 1999) referred to in the Oregon Aquatic Habitat Restoration and Enhancement Guide, May 1999.
Project Benefit
Access to over 6 miles of Upper Willamette ESU steelhead habitat will be improved.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
4.50 |
4.00 |
Funding Details |
PCSRF | $118,750 |
Report Total: | $118,750 |
|
| |
Worksites
181
- Worksite Identifier: 181
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Willamette (170900)
- Subbasin: Yamhill
- Watershed:
- Subwatershed:
- State: Oregon
- Recovery Domain: Willamette River
- Latitude: 45.1311585332237
- Longitude: -123.638848844411
ESU
- Upper Willamette River Chinook Salmon ESU
- Upper Willamette River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 118,750.00
- . . C.0.b
Length of stream treated/protected 6.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
none |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.0.d.3
Monitoring text (from Phase I) | |
Project sites will be inspected for compliance with design specifications after completion and again after first high flows. |
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 118,750.00
- . . . . C.2.b.1
Length of stream made accessible 4.50
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 4
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 4
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade 4.50
|
|