Mid-Coast Watershed Council Technical Support

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID2006-04-2
Recovery DomainsOregon Coast
Start Date07/01/2005
End Date06/30/2009
Year2005
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


1) Work was conducted on the Lint Slough tidal hydrology assessment and the draft restoration plan was evaluated.
2) High priority sixth fields were selected to develop limiting factors for Coho salmon and associated restoration plans with the Mid-Coast Watersheds Council.
3) A draft Salmon River assessment was developed with the Nature Conservancy and the Salmon-Drift Watershed council.

Project Benefit    


This project will contribute to an increase in local and tribal capacity to develop and implement watershed/sub-basin plans. All plans will be based on technical assessments that identify threats and specific factors limiting production of salmon populations and include1) an inventory of existing activities; 2) an evaluation of efforts needed to address limiting factors; and.3) a prioritized list of strategies and actions to improve the management, protection restoration, and conservation of salmon populations.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$144,549
Report Total:$144,549


Project Map



Worksites

20027968    


  • Worksite Identifier: 20027968
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Southern Oregon Coastal (171003)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Oregon
  • Recovery Domain: Oregon Coast
  • Latitude: 43.37857
  • Longitude: -123.50967

ESU

  • Oregon Coast Chinook Salmon ESU
  • Oregon Coast Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding 144,549.00
    •      . . B.0.b.1 Area Encompassed 6,805,092.0
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding 144,549.00
      •      . . . . B.1.b.3 Coordination of watershed conservation and restoration effortsY (Y/N)
        •      . . . . . . B.1.b.3.a
          Name of plan
          draft Lint Slough hydrology assessment and restoration plan; Mid-Coast restoration plans; draft Salmon River assessment
        •      . . . . . . B.1.b.3.b
          Description and scope of the plan implemented
          These are habitat restoration assessments and plans intended to benefit anadromous salmonids.
      •      . . . . B.1.b.4 Watershed council supportY (Y/N)
        •      . . . . . . B.1.b.4.a
          Name of plan developed or implemented
          draft Lint Slough hydrology assessment and restoration plan; Mid-Coast restoration plans; draft Salmon River assessment
        •      . . . . . . B.1.b.4.b
          Description of the Plan
          These are habitat restoration assessments and plans intended to benefit anadromous salmonids.