Operation and Maintenance of Bonaparte Acclimation Pond

Salmonid Hatcheries and Harvest Management

Hatchery Production
Project IDCCT05-3
Recovery DomainsUpper Columbia River
Start Date10/01/2005
End Date07/01/2007
Year2005
StatusCompleted
Last Edited01/26/2024
 
1 - 1

Description    


This project will provide funding for the operation and maintenance associated with the Bonaparte Acclimation Pond located within the Okanogan subbasin. The acclimation pond will be used to improve distribution and abundance of naturally spawning populations of summer Chinook salmon in the subbasin. This project will utilize the Bonaparte Acclimation Ponds. This pond has successfully reared spring Chinook salmon two years and reared summer Chinook salmon in 2003. During 2003, several issues limited survival at the pond. However, these issues originated from thermal shock due to warm water from the originating faciltity (East bank fish hatchery) to the receiving water at Bonaparte Pond. Measures are in place to prevent this issue from reoccurring.

Project Benefit    


Increase steelhead and Chinook juvenile production and subsequent increases in numbers of sub-yearling out-migration.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$58,327
Report Total:$58,327


Project Map



Worksites

20025634    


  • Worksite Identifier: 20025634
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Upper Columbia (170200)
  • Subbasin: Okanogan
  • Watershed:
  • Subwatershed:
  • State: Washington
  • Recovery Domain: Upper Columbia River
  • Latitude: 48.6863992624261
  • Longitude: -119.119115088767

ESU

  • Upper Columbia River Steelhead DPS
  • Upper Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding 58,327.00
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding 58,327.00
      •      . . . . D.1.b.1 Salmonids Reared/ReleasedY (Y/N)