Herd Creek irrigation diversion
Salmonid Habitat Restoration and Acquisition
|
SBT-Habitat | Snake River | 10/18/2005 | 07/19/2005 | 2004 | Completed | 05/08/2024 | |
| |
Description
Modified and renewed Biological Assessment after steelhead and bull trout spawning. Received an updated Biological Opinion and Instream Work Window permit. Contracted Down to Earth Excavation who completed the work between 7/12/2005 and 7/19/2005. A successful regulated headgate and fish-friendly diversion was installed in Herd Creek. Fish were able to successfully pass the diversion site without the construction of a new push-up dam.
Project Benefit
target species: Snake River Steelhead, Snake River spring/summer Chinook The project will contribute to recovery by improving steelhead and Chinook habitat.
Accomplishments
Fish Passage |
Barriers Removed |
1 |
1 |
Miles Opened |
5.00 |
5.00 |
Funding Details |
PCSRF | $9,500 |
Report Total: | $9,500 |
|
| |
Worksites
1779
- Worksite Identifier: 1779
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Salmon (170602)
- Subbasin: Upper Salmon
- Watershed:
- Subwatershed:
- State: Idaho
- Recovery Domain: Snake River
- Latitude: 44.0999997045379
- Longitude: -114.25555616746
ESU
- Snake River Spring/Summer-run Chinook Salmon ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 9,500.00
- . . C.0.b
Length of stream treated/protected .01
- . . C.0.d.3
Monitoring text (from Phase I) | |
Habitat and Fish |
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 9,500.00
- . . . . C.2.b.1
Length of stream made accessible 5.00
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 1
|
|