2004-1 | - | 07/01/2004 | 06/30/2005 | 2004 | Completed | 01/31/2024 | |
| |
Description
Restore degraded riparian areas and preserve properly functioning zones along the main stem of the Chehalis River, specifically in pockets along approximately 4 miles of shoreline located within the Chehalis Reservation. Remove non-native vegetation, plant native species to prevent erosion and provide shade. Decommission jeep trails to prevent silty runoff, remove garbage and derelict vehicles from riparian areas to protect water quality. The Chehalis River is utilized by Wahington Coastal Coho, Washington Coastal Chum, Washington Coastal Chinook, Stealhead, Cuthroat trout and Bull trout.
Project Benefit
Improve water quality by reducing siltation, removing potential pollutants and providing shade (over time) to cool water temperatures. Improve slamon habitat via enhanced streamside vegetation and eventual addition of large woody debris as trees grow and fall into the river.
Accomplishments
Riparian Habitat |
Stream Miles Treated |
4.00 |
4.00 |
Acres Treated |
|
|
Funding Details |
PCSRF | $50,000 |
Report Total: | $50,000 |
|
| |
Worksites
20022341
- Worksite Identifier: 20022341
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Lower Chehalis
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 47.2048249522292
- Longitude: -123.710043891859
ESU
- Washington Coast Chinook Salmon ESU
- Southwest Washington Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Southwest Washington Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 50,000.00
- . . C.0.b
Length of stream treated/protected 4.00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.0.d.3
Monitoring text (from Phase I) | |
Foot surveys to determine success of plantings and continued water quality monitoring for temperature, ph, turbidity and dissolved oxygen. |
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 40,000.00
- . . . . C.5.b.1
Total riparian miles streambank treated 4.00
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . C.5.j.1
Debris/structures removalY (Y/N)
- . . C.6
Upland Habitat And Sediment ProjectY (Y/N)
- . . . . C.6.a
Upland Habitat / Sediment Funding 10,000.00
- . . . . C.6.c.1
Road drainage system improvements and reconstructionY (Y/N)
- . . . . C.6.d.1
Road closure / abandonmentY (Y/N)
|
|