Snow Creek Uncas Preserve Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID20-1119 R
Recovery Domains -
Start Date07/01/2021
End Date06/30/2024
Year2021
StatusOngoing
Last Edited04/12/2024
 
1 - 1

Description    


The proposed project will result in Final Designs, project permitting, and construction of a salmon habitat restoration project on 0.5 miles of Snow Creeks mainstem. The project will result in wood supplementation and ELJ construction to increase pool frequency, trap bed material and fine sediment, raise water table, create side channels and increase volume of hyporheic flow and surface water exchange. Portions of the existing inset floodplain will be widened, with side channels excavated in suitable areas, to promote off channel habitat, floodplain connection, and further promote sediment retention. The project will provide benefits to ESA-listed Puget Sound Steelhead and Hood Canal Summer Chum, and Puget Sound Coho.

Project Benefit    


Within 3 years of funding, NOSC will develop final designs and restore approximately 0.5 miles of degraded Hood Canal Summer Chum salmon spawning and rearing habitat through ELJ construction to stop incision, sort and maintain gravels within the reach and to reengage the inset floodplain where it exists through the site. Where the inset floodplain has yet to develop, excavation of floodplain habitat and excavation of side channel habitat will ensure the system has a meaningful connection to its floodplain at project completion.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .50

Funding Details

SourceFunds
State$1,373,844
Report Total:$1,373,844


Project Map



Worksites

1-Snow Creek Uncas Preserve    


  • Worksite Identifier: 1-Snow Creek Uncas Preserve
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 47.96690702
  • Longitude: -122.88338026

ESU

  • Puget Sound/Strait of Georgia Coho Salmon ESU
  • Hood Canal Summer-run Chum Salmon ESU
  • Puget Sound Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement
        •      . . . . . . C.4.d.7 Number of structures placed in channel