Yakama Nation Naches Spring Chinook – Supplementation Planning

Salmonid Hatcheries and Harvest Management

Hatchery Production
Project ID23-Yaka-02
Recovery Domains -
Start Date03/01/2024
End Date02/28/2205
Year2023
StatusNew
Last Edited03/11/2024
 
1 - 1

Description    


This is a feasibility proposal that will eventually implement small-scale, assisted production of spring Chinook Salmon in the Naches River spawning population. This proposed emergency action is in response to alarmingly low escapement (<160) and redd counts (31) in 2019 for the American and Naches populations (part of the mid-Columbia spring Chinook ESU), considered genetically unique in the Yakima Basin. Spawner abundance of 200 or fewer fish is an indication of “quasi” or high-extinction risk for Pacific Salmon (Nehlsen et al. 1991; Hard et al. 2015). The proposed action will help safeguard against catastrophic recruitment failure, and is deemed necessary by the Yakama Nation {YN) to preserve its treaty-reserved fishing rights.



The proposed work site is at Oak Flats (owned by the Washington Department of Fish and Wildlife-WDFW) on the Naches River near the confluence of the Tieton and Naches Rivers and highways 410 and 12 west of Naches, Washington (1102 SR Hwy 410, Naches, WA 98937; Yakima County parcel identifiers 161535-22001, 161535-23001, 161534-12001). Priorities for this PCSRF grant request will be for initial development of the site including:



• Well testing

• Ground and surface water permit application process completion

• Site preparation (environmental analyses, development of necessary road, power, security [fencing, gates, lighting] infrastructure at the site)

• If dollars still available, begin purchasing other infrastructure (tanks, piping, etc.)



Other funding sources will be in-kind contributions from the YN and WDFW to cover salaries, fringe, and overhead costs for activities associated with further development and implementation of this proposal including a cultural survey of the Oak Flats property. Federal funding for these in-kind contributions will include Bonneville Power Administration and the U.S. Bureau of Reclamation. This project continues the work that was initiated under PCSRF project 22-Yaka-03.



Worksite #1 Proposed Work:

The proposed work site is at Oak Flats {owned by the Washington Department of Fish and Wildlife-WDFW) on the Naches River near the confluence of the Tieton and Naches Rivers and highways 410 and 12 west of Naches, Washington (1102 SR Hwy 410, Naches, WA 98937; Yakima County parcel identifiers 161535-22001, 161535-23001, 161534-12001). Priorities for this PCSRF grant request will be for initial development of the site including:

• Well testing

• Ground and surface water permit application process completion

• Site preparation (environmental analyses, development of necessary road, power, security [fencing, gates, lighting] infrastructure at the site)

• If dollars still available, begin purchasing other infrastructure (tanks, piping, etc.)

Project Benefit    


There will be no immediate benefit to salmon from implementation of this proposal (completion of necessary preliminary site development tasks). This site is necessary to achieve long-term goals and expected benefits to these unique populations of spring Chinook (mid-Columbia ESU) Salmon which include:

• Prevent further decline or extirpation of these genetically unique populations

• Increase natural spawning in historical habitats

• Contribute adults to marine, Zone 6, and Yakima River fisheries

• Increase the number of spring Chinook salmon returning to the Yakima River Basin to abundance levels sufficient to allow Yakama Nation youth to be taught traditional fishing methods so that YN culture can survive and thrive into the future

• Contribute to treaty-reserved fishing goals per U.S. v Oregon management agreements and Wy-Kan-Ush-Mi Wa-Kish-Wit.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$180,000
Other$48,300
Report Total:$228,300


Project Map



Worksites

Oak Flats    


  • Worksite Identifier: Oak Flats
  • Start Date: 03/01/2024
  • End Date: 02/28/2025
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.7487343
  • Longitude: -120.7970183

ESU

  • Mid-Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • D.0 Salmonid Hatcheries and Harvest ManagementY (Y/N)
    •      . . D.0.a Hatchery and harvest mgmt. funding .00
    •      . . D.0.b
      Complement habitat restoration project
    •      . . D.0.c
      Project Identified in a plan or watershed assessment.
    •      . . D.1 Hatchery Production ProjectY (Y/N)
      •      . . . . D.1.a Hatchery Production Funding
      •      . . . . D.1.c.1 Hatchery operations - facility or equipmentY (Y/N)
        •      . . . . . . D.1.c.2
          Description of the facility modification and/or equipment purchase
        •      . . . . . . D.1.c.3 Funding for facility equipment or structures