Upper Gaviota Fish Passage Project-65% Engineering Designs

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID1671664718505
Recovery Domains -
Start Date05/01/2023
End Date12/31/2025
Year2022
StatusOngoing
Last Edited03/27/2024
 
1 - 1

Description    


The project will develop agency approved 65% designs that address nine fish passage barriers that limit fish migration in the Gaviota Creek Watershed. The project will use detailed topographic surveys of the sites produced by Caltrans District 5 to develop alternative designs to promote fish possibility at each fish barrier structure, hydraulic modeling to ensure fish passage criteria is satisfied, and model flood conveyance at each site. To achieve a preliminary design that meets fish passage criteria and Caltrans design requirements will require multiple meetings between the project partners. Analysis will be made of the design alternatives, feedback will be reviewed and incorporated, and a review conducted to consider any increased risk to the highway structure or flood impacts. Once all the stakeholders agree on a preferred design, work will proceed to 65% design completion.

Project Benefit    


Developing 65% engineering designs at the nine fish passage barriers is the first step to remediating fish passage within Gaviota Creek at these locations. The proposed designs will provide the scaffolding for future implementation work, which once implemented, will provide Federally Endangered Southern Steelhead Trout connectivity to higher quality spawning and rearing habitats.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$176,503
In-Kind Donated Labor$80,000
In-Kind Other$88,004
Report Total:$344,507


Project Map



Worksites

1671664718843    


  • Worksite Identifier: 1671664718843
  • Start Date:
  • End Date:
Area Description
BR CHUTE

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.491063
  • Longitude: -120.226347

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718846    


  • Worksite Identifier: 1671664718846
  • Start Date:
  • End Date:
Area Description
BLDR JAM

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.491498
  • Longitude: -120.226263

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718852    


  • Worksite Identifier: 1671664718852
  • Start Date:
  • End Date:
Area Description
GA 8

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.494187
  • Longitude: -120.229597

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718855    


  • Worksite Identifier: 1671664718855
  • Start Date:
  • End Date:
Area Description
GA 9

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.4943
  • Longitude: -120.2298

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718858    


  • Worksite Identifier: 1671664718858
  • Start Date:
  • End Date:
Area Description
GA10

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.4944
  • Longitude: -120.2301

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718864    


  • Worksite Identifier: 1671664718864
  • Start Date:
  • End Date:
Area Description
GA12

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.494903
  • Longitude: -120.23059

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718867    


  • Worksite Identifier: 1671664718867
  • Start Date:
  • End Date:
Area Description
GA13

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.495272
  • Longitude: -120.230895

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718849    


  • Worksite Identifier: 1671664718849
  • Start Date:
  • End Date:
Area Description
GA 7

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.492006
  • Longitude: -120.226395

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

1671664718861    


  • Worksite Identifier: 1671664718861
  • Start Date:
  • End Date:
Area Description
GA11

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 34.49464
  • Longitude: -120.230361

ESU

  • Southern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.2 Coordination on implementation of a Recovery PlanY (Y/N)
        •      . . . . . . B.1.b.2.a
          Name of the Recovery Plan Implemented
        •      . . . . . . B.1.b.2.b
          Description and scope of the Recovery Plan implemented
      •      . . . . B.1.b.6 Support to local entities or agenciesY (Y/N)
        •      . . . . . . B.1.b.6.a
          Name of plan developed or implemented
        •      . . . . . . B.1.b.6.b
          Description and scope of the plan developed/implemented
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented