Potrero Creek Fish Passage Project
Salmonid Habitat Restoration and Acquisition
|
1641938758498 | S. California - S. Central CA Coast | 07/26/2022 | 11/12/2024 | 2019 | Completed | 01/14/2025 | |
| |
Description
The Project has successfully remedied an existing barrier to steelhead migration on a tributary to the Carmel River by decommissioning (removing) an undersized, corroded 100-foot long, 54-inch diameter steel pipe road culvert in Potrero Creek and replace it with a 1210 span by 84 rise multiplate arched culvert designed to improve fish passage conditions, improve flood conveyance and provide safe vehicle access across Potrero Creek. All FY18 PCSRF funds were spent within the award period.
Project Benefit
This project will remediate a high priority steelhead migration barrier improving access into high quality perennial spawning and rearing habitat.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
.25 |
.25 |
Funding Details |
PCSRF | $543,830 |
State | $75,000 |
Other | $433,023 |
Report Total: | $1,051,853 |
|
| |
Worksites
1641938758753
- Worksite Identifier: 1641938758753
- Start Date:
- End Date:
Area Description
Downstream CVAC Culvert
Location Information
- Basin: Central California Coastal (180600)
- Subbasin: Central Coastal (18060006)
- Watershed: Carmel River (1806000601)
- Subwatershed: Potrero Canyon-Carmel River (180600060106)
- State: California
- Recovery Domain: S. California - S. Central CA Coast
- Latitude: 36.528938
- Longitude: -121.86733
ESU
- South-Central California Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1,051,853.00
- . . C.0.b
Length of stream treated/protected .04
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 1,051,852.97
- . . . . C.2.b.1
Length of stream made accessible .25
- . . . . C.2.b.2
Square miles of streambed made accessible.1 (Square miles)
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.f.1
Culvert installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.f.2
Number of culverts installed or improved 1
- . . . . . . C.2.f.3
Miles of stream made accessible by culvert installation/upgrade .25
|
|