Potrero Creek Fish Passage Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID1641938758498
Recovery DomainsS. California - S. Central CA Coast
Start Date07/26/2022
End Date11/12/2024
Year2019
StatusCompleted
Last Edited01/14/2025
 
1 - 1

Description    


The Project has successfully remedied an existing barrier to steelhead migration on a tributary to the Carmel River by decommissioning (removing) an undersized, corroded 100-foot long, 54-inch diameter steel pipe road culvert in Potrero Creek and replace it with a 1210 span by 84 rise multiplate arched culvert designed to improve fish passage conditions, improve flood conveyance and provide safe vehicle access across Potrero Creek. All FY18 PCSRF funds were spent within the award period.

Project Benefit    


This project will remediate a high priority steelhead migration barrier improving access into high quality perennial spawning and rearing habitat.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened .25 .25

Funding Details

SourceFunds
PCSRF$543,830
State$75,000
Other$433,023
Report Total:$1,051,853


Project Map



Worksites

1641938758753    


  • Worksite Identifier: 1641938758753
  • Start Date:
  • End Date:
Area Description
Downstream CVAC Culvert

Location Information

  • Basin: Central California Coastal (180600)
  • Subbasin: Central Coastal (18060006)
  • Watershed: Carmel River (1806000601)
  • Subwatershed: Potrero Canyon-Carmel River (180600060106)
  • State: California
  • Recovery Domain: S. California - S. Central CA Coast
  • Latitude: 36.528938
  • Longitude: -121.86733

ESU

  • South-Central California Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,051,853.00
    •      . . C.0.b Length of stream treated/protected .04
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 1,051,852.97
      •      . . . . C.2.b.1 Length of stream made accessible .25
      •      . . . . C.2.b.2 Square miles of streambed made accessible.1 (Square miles)
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .25