Smith River Estuary Backwater Habitat Enhancement Project - Tedsen Backwater

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project ID1640903378253
Recovery Domains -
Start Date05/12/2022
End Date04/01/2026
Year2018
StatusOngoing
Last Edited03/12/2024
 
1 - 1

Description    


The project will enhance a naturally occurring backwater feature present on the south bank of the Smith River estuary by enhancing the duration and range of flows that migrating and rearing juvenile salmonids have access to off-channel habitat and low-flow refugia. The project will restore natural processes that maintain the feature. The project includes placing large wood structures in the stream as well as riparian restoration (planting and fencing) along the stream bank.

Project Benefit    


The project will increase channel complexity along the mainstem Smith River and addresses impaired estuary function by increasing the amount off-channel slow water rearing habitat. Impaired estuary function is a high stress to both the juvenile and smolt life stages of salmonids. This project will benefit and support Coho Salmon populations and implement high priority recovery actions identified by CDFW (2004) and NOAA (2014).

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .13
Riparian Habitat
  Stream Miles Treated .34
  Acres Treated .3

Funding Details

SourceFunds
PCSRF$527,637
In-Kind Donated Labor$16,045
In-Kind Other$11,741
Report Total:$555,423


Project Map



Worksites

1640903378500    


  • Worksite Identifier: 1640903378500
  • Start Date:
  • End Date:
Area Description
Mouth of Backwater

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 41.91198
  • Longitude: -124.188021

ESU

  • Southern Oregon / Northern California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected .13
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement
        •      . . . . . . C.4.d.4 Acres of streambed treated through channel structure placement
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement
        •      . . . . . . C.4.d.6 Yards of average stream-width at mid-point of channel structure placement project (Yards)
        •      . . . . . . C.4.d.7 Number of structures placed in channel
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
          •      . . . . . . C.5.c.3 Acres planted in riparian
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing