Albion River and Tom Bell Creek Instream Habitat Enhancement Project
Salmonid Habitat Restoration and Acquisition
|
1640903380173 | N Central California Coast | 04/22/2022 | 04/30/2026 | 2021 | Ongoing | 11/19/2024 | |
| |
Description
This project will treat 4,655 feet (~0.9 miles) of high-priority Coho Salmon recovery habitat in Tom Bell Creek and the mainstem Albion River with 117 pieces of large wood at 43 distinct structure/feature locations. This project will increase the quantity and quality of instream habitat within the project area, and will restore geomorphic function by increasing pool frequency and depth, increasing the availability of velocity and temperature refugia habitat, and sorting instream sediments.
Project Benefit
This project will increase stream habitat complexity, pool frequency, pool depth, high-flow refugia, and over-summer rearing habitat for Coho Salmon, Steelhead Trout, and Chinook Salmon.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
.90 |
Funding Details |
PCSRF | $363,760 |
In-Kind Other | $186,033 |
Report Total: | $549,793 |
|
| |
Worksites
1640903380422
- Worksite Identifier: 1640903380422
- Start Date:
- End Date:
Area Description
Albion River and Tom Bell Creek
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin: Big-Navarro-Garcia (18010108)
- Watershed: Albion River-Frontal Pacific Ocean (1801010808)
- Subwatershed: Albion River (180101080801)
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 39.26691
- Longitude: -123.64361
ESU
- California Coastal Chinook Salmon ESU
- Central California Coast Coho Salmon ESU
- Northern California Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
|
|