South Fork Usal Creek Instream Enhancement Design Project

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID1611968199899
Recovery DomainsN Central California Coast
Start Date05/05/2021
End Date03/15/2024
Year2020
StatusOngoing
Last Edited05/03/2024
 
1 - 1

Description    


The overall objective of this project is to create shovel-ready conceptual designs for approximately 200 large wood (LW) structures and 100% final engineered design plans for approximately five engineered log jams (ELJs) to restore geomorphic function along approximately 3.5 miles of South Fork Usal Creek. Designed LW structures will provide elements of instream habitat and enhance fluvial geomorphic processes by conducting detailed characterizations of the biologic, geomorphic, topographic, and hydrologic conditions. It is expected that the lowest 0.5-mile of the project area will require development of 100% final engineered LW structures (~5) to produce the greatest ecological benefit. The upper 3.0 miles of the proposed project area is considered conducive to non-engineered structure implementation, and it is anticipated that these LW structures (~200) will consist of a combination of woven complex spider jams and accelerated recruitment structures.

Project Benefit    


Project designs will improve rearing requirements for salmonids and will address riparian dysfunction, habitat complexity, and water quality impairments.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$368,002
In-Kind Donated Labor$4,500
Report Total:$372,502


Project Map



Worksites

1611968200129    


  • Worksite Identifier: 1611968200129
  • Start Date:
  • End Date:
Area Description
South Fork Usal Creek

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 39.834719
  • Longitude: -123.807255

ESU

  • California Coastal Chinook Salmon ESU
  • Central California Coast Coho Salmon ESU
  • Northern California Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected 3.50
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented