Makah Tribe FY 2021 Umbrella OZ Mainline Fish Passage Improvement
Salmonid Habitat Restoration and Acquisition
|
21-MAKA-01 | Ozette Lake | 10/01/2023 | 12/31/2024 | 2021 | New | 02/27/2024 | |
| |
Description
This project will help address a newly identified fish passage barrier that is located in habitat that is occupied by ESA-listed Lake Ozette sockeye. The fish passage barrier stream crossing structure is located in the Umbrella sub-basin of the Ozette Watershed on tribal industrial timberlands and is adjacent to the Makah Tribe’s Lake Ozette Sockeye Umbrella Creek Hatchery. The current structure is an undersized culvert, and the anticipated replacement structure will be a bridge. The upstream available habitat is estimated to be 2.5 miles. This project will assist in the construction costs of the project. It is anticipated that these funds will not be enough to cover the entire project, and will be partnered with the landowner’s contributions. Total project preliminary estimates for construction is approximately $300,000.
Project Benefit
The expected benefits of this project is to improve access to salmon habitat for spawning and rearing
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
|
2.50 |
Funding Details |
PCSRF | $141,793 |
Report Total: | $141,793 |
|
| |
Worksites
OZ Mainline Road in the Umbrella sub-basin of the Ozette Watershed
- Worksite Identifier: OZ Mainline Road in the Umbrella sub-basin of the Ozette Watershed
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Hoh-Quillayute (17100101)
- Watershed: Ozette Lake-Frontal Pacific Ocean (1710010102)
- Subwatershed: Umbrella Creek (171001010203)
- State: Washington
- Recovery Domain: Ozette Lake
- Latitude: 48.1741667
- Longitude: -124.6
ESU
- Ozette Lake Sockeye Salmon ESU
- Puget Sound Chinook Salmon ESU
- Puget Sound Steelhead DPS
- Puget Sound/Strait of Georgia Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding .00
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding
- . . . . C.2.b.1
Length of stream made accessible
- . . . . C.2.b.2
Square miles of streambed made accessible (Square miles)
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade
|
|