George Creek Barrier Removal

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project ID018 23 CW
Recovery Domains -
Start Date11/29/2023
End Date10/31/2026
Year2023
StatusNew
Last Edited02/27/2024
 
1 - 1

Description    


The George Creek Barrier Removal project will restore access to 1.67 miles of steelhead habitat in the Cottonwood Creek watershed in Nez Perce County, Idaho by replacing an undersized culvert. Currently there is no steelhead access to the stream due to a full passage barrier at all life stages. Access is currently blocked by an 8 foot diameter culvert with a four foot outlet drop which prevents steelhead from passing through the culvert. The design phase of this project was completed through PCSRF project 004 20 CW.

Project Benefit    


This project will allow access to 1.67 miles of perennial stream in the Cottonwood Creek drainage. As access is improved, pre-smolt and smolt stages of steelhead utilization of the stream is expected to increase.

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened 1.67

Funding Details

SourceFunds
Other$712,626
In-Kind Donated Labor$7,212
Report Total:$719,838


Project Map



Worksites

WS-1    


  • Worksite Identifier: WS-1
  • Start Date: 08/01/2025
  • End Date: 10/31/2026
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Middle Snake-Boise (170501)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: Idaho
  • Recovery Domain:
  • Latitude: 44.44394
  • Longitude: -116.6252984

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding
      •      . . . . C.2.b.1 Length of stream made accessible
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade