Stream Bank Restoration: Fairbanks Cost Share - Phase 6

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDAK56017
Recovery Domains -
Start Date03/01/2024
End Date11/30/2026
Year2022
StatusOngoing
Last Edited03/18/2024
 
1 - 1

Description    


The Alaska Department of Fish and Game (ADF&G) will partner with the United States Fish and Wildlife Service (USFWS), local governments, local nonprofit organizations, and landowners to assess, prioritize, and conduct restoration and rehabilitation projects on public and private lands over a three-year period. This project will provide funding, technical project design assistance, and on-the-ground project construction oversight.

Project Benefit    


This project will benefit fish habitat directly removing detrimental structures from streams; conserving healthy riverbank; and rehabilitating degraded riverbank. This work will help maintain healthy fish populations, productive fish habitat, riparian vegetation, and riparian function, and may help mitigate the effects of climate change through riparian plantings.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .05
Riparian Habitat
  Stream Miles Treated .04
  Acres Treated .1

Funding Details

SourceFunds
PCSRF$298,609
State$39,000
Other$205,514
Report Total:$543,123


Project Map



Worksites

54459902    


  • Worksite Identifier: 54459902
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Tanana River (190803)
  • Subbasin: Tanana Flats-Tanana River (19080307)
  • Watershed: McDonald Creek-Tanana River (1908030713)
  • Subwatershed: City of Fairbanks-Tanana River (190803071306)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 64.77516
  • Longitude: -147.99427

ESU

  • Un-Named ESU Coho
  • Un-Named ESU Chum
  • Un-Named ESU Chinook

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding
      •      . . . . C.4.b Total length of instream habitat treated
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian