FY 2023 Quinault Indian Nation – Instream and Riparian Restoration
Salmonid Restoration Planning and Assessments
|
23-QUIN-02 | - | 07/01/2023 | 06/30/2025 | 2023 | New | 03/29/2024 | |
| |
Description
The purpose of the project is to document fish use to inform management and restoration of fisheries resources and salmon habitats, assess and characterize baseline conditions of instream and riparian habitats, and to develop large woody debris, instream, and riparian forest rehabilitation designs. The emphasis of this year’s funding will be in the Big Creek Sub-basin (or other moderate to large size tributary to the Upper Quinault River) and further assessment of the Upper Quinault mainstem river (Wilson’s Reach) for prioritization of restoration actions.
Project Benefit
The project will apply a reach-scale survey and design approach to develop instream and riparian restoration conceptual drawings for future implementation in the Big Creek subbasin and the Upper Quinault River.
Accomplishments
Planning and Assessment |
Stream Miles Assessed |
|
8.00 |
Funding Details |
PCSRF | $100,000 |
Report Total: | $100,000 |
|
| |
Worksites
Upper Quinault River Watershed
- Worksite Identifier: Upper Quinault River Watershed
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Lower Chehalis (17100104)
- Watershed: Satsop River (1710010401)
- Subwatershed: Middle Fork Satsop River (171001040103)
- State: Washington
- Recovery Domain:
- Latitude: 47.310469
- Longitude: -123.464664
ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
- Quinault Lake Sockeye Salmon ESU
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.2
Coordination on implementation of a Recovery PlanY (Y/N)
- . . . . . . B.1.b.2.a
Name of the Recovery Plan Implemented | |
|
- . . . . . . B.1.b.2.b
Description and scope of the Recovery Plan implemented | |
|
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.12
Developing restoration/action planY (Y/N)
- . . . . . . B.1.b.12.a
- . . . . . . B.1.b.12.b
Description and scope of the plan developed | |
|
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed
- . . . . . . B.2.c.3
Stream miles assessed that contained salmonids
- . . . . . . B.2.c.4
Stream miles assessed that needed restoration
- . . . . B.2.d
Habitat surveysY (Y/N)
- . . . . . . B.2.d.1
Type of habitat survey/assessment (LOV)
- . . . . . . B.2.d.2
Amount of habitat assessed
- . . . . . . B.2.d.3
Amount of habitat assessed that needed restoration
Big Creek Sub-Watershed
- Worksite Identifier: Big Creek Sub-Watershed
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Washington Coastal (171001)
- Subbasin: Lower Chehalis (17100104)
- Watershed: Satsop River (1710010401)
- Subwatershed: Middle Fork Satsop River (171001040103)
- State: Washington
- Recovery Domain:
- Latitude: 47.320662
- Longitude: -123.45305
ESU
- Washington Coast Chinook Salmon ESU
- Olympic Peninsula Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Olympic Peninsula Steelhead DPS
- Quinault Lake Sockeye Salmon ESU
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding .00
- . . B.0.b.1
Area Encompassed
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.2
Coordination on implementation of a Recovery PlanY (Y/N)
- . . . . . . B.1.b.2.a
Name of the Recovery Plan Implemented | |
|
- . . . . . . B.1.b.2.b
Description and scope of the Recovery Plan implemented | |
|
- . . . . B.1.b.8
Conducting habitat restoration scoping and feasibility studiesY (Y/N)
- . . . . . . B.1.b.8.a
- . . . . . . B.1.b.8.b
Description and scope of the plan implemented | |
|
- . . . . B.1.b.12
Developing restoration/action planY (Y/N)
- . . . . . . B.1.b.12.a
- . . . . . . B.1.b.12.b
Description and scope of the plan developed | |
|
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding
- . . . . B.2.c
Instream SurveyY (Y/N)
- . . . . . . B.2.c.1
Type of instream survey (LOV)
- . . . . . . B.2.c.2
Stream miles assessed
|
|