Mission Creek Protection Phase 1

Salmonid Habitat Restoration and Acquisition

Land or Easement Acquisition
Project ID23-1269 A
Recovery Domains -
Start Date09/14/2023
End Date01/31/2027
Year2023
StatusOngoing
Last Edited04/12/2024
 
1 - 1

Description    


The Chelan-Douglas Land trust will acquire a perpetual conservation easement on approximately 40 acres between RM 4.1 and 4.9 of Mission Creek and adjacent to Mission Creek Road.  The goal is to preserve this land after removal of the orchard and two associated irrigation diversions. The orchard will be removed by the owners at their cost, and with this grant, the property will be permanently protected from development. The property supports listed spring chinook and steelhead, as well as non-listed Coho and Lamprey.  Protection and potential future restoration will benefit spawning, fry colonization and winter rearing. The landowners will allow foot access as well as educational and scientific study.  The landowners and CDLT will work with salmon recovery partners on future restoration possibilities.

Project Benefit    


The primary goal of the project is a conservation easement on 40 acres of former agricultural land including over a mile and a half of steambank, measured on both sides of Mission Creek. After sale of their irrigation water, the landowners will remove the diversions and orchards (not funded by this grant). CDLT will acquire the conservation easement on vacant land in 2026. The landowners and CDLT are committed to future restoration after the CE is acquired. Based on the Upper Columbia information prioritization, both removal of the agriculture and future restoration can provide significant improvements to stream flow, temperature, vegetative cover, floodplain connection and off channel habitat to benefit salmon at multiple life stages.

Accomplishments

Metric Completed Originally
Proposed
Land Acquisition
  Acres Acquired or Protected .0 40.0
  Stream Bank Miles Acquired
  or Protected
.00 1.56

Funding Details

SourceFunds
Other$263,600
Report Total:$263,600


Project Map



Worksites

1-Mission Creek Phase 1    


  • Worksite Identifier: 1-Mission Creek Phase 1
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 47.46840815
  • Longitude: -120.49098019

ESU

  • Upper Columbia River Steelhead DPS
  • Upper Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.10 Land or Easement AcquisitionY (Y/N)
      •      . . . . C.10.a Land acquisition funding .00
      •      . . . . C.10.b Habitat treatments applied (LOV)
      •      . . . . C.10.c.1 Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
        •      . . . . . . C.10.c.2 Type of acquisition to protect habitat (LOV)
        •      . . . . . . C.10.c.3 Type of property protected (LOV)
        •      . . . . . . C.10.c.4 Date of expiration of protection (mm/dd/yyyy)
        •      . . . . . . C.10.c.5 Miles of streambank protected by land or easement acquisition .00
        •      . . . . . . C.10.c.6 Acres of land, wetland or estuarine area acquired .0