Asotin Creek PA 3.2 Restoration
Salmonid Habitat Restoration and Acquisition
|
23-1023 R | - | 09/14/2023 | 06/30/2026 | 2023 | Ongoing | 04/12/2024 | |
| |
Description
The Asotin County Conservation District is sponsoring the Asotin Creek PA 3.2 Stream Restoration Project. This grant will target 1.2 miles of Asotin Creek. The design for PA 3.2 includes large woody debris and boulder structure placement, controlling invasive vegetation encroachment, and enhancing riparian conditions to increase stream complexity and promote side channel connection. This project will build upon the current stream conditions by adding more habitat features for Snake River Steelhead.
Project Benefit
The goal of this project is to improve fish habitat and enhance riparian conditions for the upper portion of PA-03 which includes RM 4.0 to RM 5.2. This will address the management objectives that were identified in the Asotin Conceptual Restoration Plan. The project will provide instream habitat complexity through the placement of large wood structures and boulder clusters, to enhance Snake River steelhead for all life stages, install a bridge crossing to eliminate livestock and vehicle fords, control invasive vegetation encroachment, and promote riparian function. This project area in enrolled in the Conservation Reserve Enhancement Program and is in relatively good condition. The project will build on the current conditions to add more habitat features and enhance riparian conditions.
Accomplishments
Instream Habitat |
Stream Miles Treated |
|
1.20 |
Riparian Habitat |
Stream Miles Treated |
|
1.20 |
Acres Treated |
|
8.0 |
Funding Details |
PCSRF | $151,821 |
Other | $120,000 |
Report Total: | $271,821 |
|
| |
Worksites
1-Asotin Creek PA 3.2
- Worksite Identifier: 1-Asotin Creek PA 3.2
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 46.32183743
- Longitude: -117.12562823
ESU
- Snake River Basin Steelhead DPS
- Un-Named ESU Chinook
- Snake River Spring/Summer-run Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding
- . . C.0.b
Length of stream treated/protected
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
|
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding
- . . . . C.4.b
Total length of instream habitat treated
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement
- . . . . . . C.4.d.7
Number of structures placed in channel
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding
- . . . . C.5.b.1
Total riparian miles streambank treated
- . . . . C.5.b.2
Total Riparian Acres Treated
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
|
- . . . . . . C.5.c.3
Acres planted in riparian
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting
|
|