Walla Walla River Forks Floodplain Reconnection and In-stream Enhancement Implementation
Salmonid Habitat Restoration and Acquisition
|
OWEB 221-6023-19540 | - | 10/26/2021 | 09/27/2023 | 2019 | Completed | 04/12/2024 | |
| |
Description
The design for the Forks project has increased the channel complexity and morphology closer to the historical form and function. With the addition of multiple large wood structures, the instream velocity range is more diverse at high and low flows. This project gained different types of fish habitats and river complexity by adding wood structures instream and on the floodplain. The large wood structures create thermal diversity throughout the year and help with sediment transportation and redistribution. Removal and partial removal of a levee reconnected side channels and flood plain. The connection of the floodplain allows for the frequency of inundation. Riparian corridors were replanted with native plants and reseeded with native grass mix to gain better function.
Project Benefit
This project will increase floodplain connectivity, increase in-stream habitat complexity, increase off-channel habitat availability, and remove barriers to fish passage in high quality spawning and rearing habitat for ESA-listed Middle Columbia Summer Steelhead as well as other native fish species. To the extent practical, our design focused on increasing the quality and quantity of habitat for juvenile steelhead and other fish species. Our analyses show that for the high-flow conditions, juvenile rearing habitat will experience the most substantial uplift owing to the added roughness features in the mainstem channels and reconnection of considerable floodplain habitat. Winter rearing conditions will also improve with the creation of pools associated with large wood structures.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.75 |
.76 |
Riparian Habitat |
Stream Miles Treated |
1.40 |
.50 |
Acres Treated |
5.0 |
2.0 |
Fish Passage |
Barriers Removed |
2 |
2 |
Miles Opened |
16.60 |
16.00 |
Funding Details |
PCSRF | $300,000 |
Other | $1,131,922 |
Report Total: | $1,431,922 |
|
| |
Worksites
20230015
- Worksite Identifier: 20230015
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 45.89860623
- Longitude: -118.30868594
ESU
- Mid-Columbia River Spring-run Chinook Salmon ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 1,431,922.00
- . . C.0.b
Length of stream treated/protected .75
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
National Marine Fisheries Service Northwest Region, 2009-11-01, Middle Columbia River Steelhead Distinct Population Segment ESA Recovery Plan; Northwest Power and Conservation Council, 2004-05-01, Northwest Power and Conservation Council Walla Walla Subbasin Plan; Office of the Governor, State of Oregon, 1999-01-01, The Oregon Plan for Salmon and Watersheds; Oregon Department of Fish and Wildlife, 2003-09-12, Oregon's Native Fish Conservation Policy; Oregon Department of Fish and Wildlife, 2010-02-01, Conservation and Recovery Plan for Oregon Steelhead Populations in the Middle Columbia River Steelhead Distinct Population Segment; Oregon Department of Fish and Wildlife, 2016-01-01, Oregon Conservation Strategy ; |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.1
Fish Screening ProjectY (Y/N)
- . . . . C.1.a
Fish screen funding 373,700.00
- . . . . C.1.d.1
Fish screens replaced or modifiedY (Y/N)
- . . . . . . C.1.d.2
Number of fish screens replaced or modified 1
- . . . . . . C.1.d.3
Flow rate of screened water 4.04 (cfs)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 127,260.00
- . . . . C.2.b.1
Length of stream made accessible 16.60
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 2
- . . . . C.2.c.1
Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
- . . . . . . C.2.c.2
Number of blockages/impediments/barriers removed/altered 2
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 866,250.00
- . . . . C.4.b
Total length of instream habitat treated .75
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .75
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .42
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .75
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 34
- . . . . . . C.4.d.7
Number of structures placed in channel 63
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 64,712.00
- . . . . C.5.b.1
Total riparian miles streambank treated 1.40
- . . . . C.5.b.2
Total Riparian Acres Treated 5.0
- . . . . C.5.c.1
Riparian plantingY (Y/N)
- . . . . . . C.5.c.2
Species of plants planted in riparian | |
Lewis' mockorange, black elderberry, chokecherry, ponderosa pine, ninebark, seep monkeyflower, oceanspray, cascara, Douglas hawthorn, red osier dogwood, water birch, serviceberry, white alder, thin leaf alder |
- . . . . . . C.5.c.3
Acres planted in riparian 5.0
- . . . . . . C.5.c.4
Miles of streambank treated with riparian planting 1.40
|
|