Sandy River Basin Aquatic Habitat Restoration Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project IDOWEB 220-3022-17368
Recovery Domains -
Start Date04/22/2020
End Date04/24/2023
Year2018
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project addressed primary limiting factors by increasing off channel habitat/floodplain connectivity and large wood abundance in high priority tributaries of the Sandy at three worksites: the mainstem Salmon River, Boulder Creek (both in the Salmon River sub-watershed) and Clear Fork (located within the Upper Sandy 6th Field watershed). All three worksites included anchored habitat structure placement. At the Boulder Creek worksite, side channels were also reconnected. At the Clear Fork worksite, restoration activities additionally included large wood placement and side channel creation. Proposed metrics that were originally reported for a single proxy site were distributed to the final worksites.

Project Benefit    


Sandy River basin spring Chinook, coho and winter steelhead are negatively impacted by loss of habitat. This project will restore habitat elements believed to be most limiting to these fish. The actions proposed will increase habitat complexity and diversity on the Salmon River, Boulder Creek and Clear Fork by increasing side channel habitat, off channel habitat, floodplain connectivity and large wood abundance.

Reactivation of flow to off-channel habitats is intended to provide spawning and rearing habitat for salmon and steelhead. The side channel design intent is to create a permeable, year-round connection point between the mainstem river and existing off-channel habitat. Alluvial material will be excavated from side channel entrances and large wood structures will be built at entrances and associated floodplains to moderate flow, provide scour to maintain the inlet, and provide complex fish habitat.

Large wood habitat structures and large wood placement are intended to maintain and improve side channel, alcove and floodplain connection, and restore habitat complexity and diversity by creating and enhancing scour pools, increasing hydraulic complexity and velocity refugia, promoting gravel deposition, and recruiting naturally occurring large wood. Large wood structures have been designed to emulate structures that existed prior to watershed alteration, and are designed to be self-sustaining.
Restoration objectives to address limiting factors were developed via restoration planning documents. Plans identify current conditions for limiting factors (eg. large wood abundance), historic conditions and restoration potential (the difference between current and historic conditions). This approach provides numeric targets that allow the Partners to develop project objectives that are directly tied to watershed objectives and Sandy basin-scale goals. In addition, monitoring of fish and habitat response makes it possible to adaptively manage the implementation of the restoration plan over time.

The Partners believe that focused, basin-scale restoration work, informed by basin-scale targets that address limiting factors, offers the best approach to ensure recovery of Sandy fish populations. To date, the Partners have completed planned actions in Still Creek, Lost Creek, Cast Creek, and lower South Fork Salmon River, while work in the Salmon, Salmon tributaries, Upper Sandy 6th Field, and mainstem Sandy corridor continues. The proposed project will implement analogous actions that TFT, USFS and BLM have used successfully to restore habitat elsewhere on the Salmon River, Still Creek and Lost Creek on behalf of the Partners.

Effectiveness monitoring and observational data demonstrate that these actions have consistently achieved the desired habitat and fish response. Data shows that past work is restoring ecosystem processes so that high quality habitat is self-sustaining. Passive restoration continues in reaches where we have met applied restoration targets, providing a strong indicator of the Partners’ restoration approach and likelihood of proposed actions benefiting salmon and steelhead.

The Pacific Northwest is expected to see dramatic increases in temperatures due to climate change, with more rain in winter and spring, increased variability in peak flows, reduced snow-packs and drier summers. The Partners’ planning documents recommend actions that will recover natural river processes and riparian function by reactivating the floodplain and naturally aggrading the rivers; which will disperse flood flows providing high velocity refuge and attenuating downstream flooding, increasing hyporheic flows and decreasing water temperature, and providing cold water refuge and carbon sequestration in healthy native riparian stands that exclude invasive plants.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.50 1.60

Funding Details

SourceFunds
PCSRF$168,800
State$168,800
Other$159,379
In-Kind Donated Labor$113,760
In-Kind Other$140,500
Report Total:$751,239


Project Map



Worksites

20220271    


  • Worksite Identifier: 20220271
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.39557461
  • Longitude: -121.85848073

ESU

  • Lower Columbia River Coho Salmon ESU
  • Lower Columbia River Steelhead DPS
  • Lower Columbia River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 356,641.00
    •      . . C.0.b Length of stream treated/protected .80
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Oregon Department of Fish and Wildlife, 2010-08-01, Lower Columbia River Conservation and Recovery Plan for Oregon Populations of Salmon and Steelhead; Oregon Department of Fish and Wildlife, 2016-01-01, Oregon Conservation Strategy ;
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 356,641.00
      •      . . . . C.4.b Total length of instream habitat treated .80
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .01
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .04
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .80
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 6
        •      . . . . . . C.4.d.7 Number of structures placed in channel 17

20220100    


  • Worksite Identifier: 20220100
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.3617618
  • Longitude: -122.0055741

ESU

  • Lower Columbia River Coho Salmon ESU
  • Lower Columbia River Steelhead DPS
  • Lower Columbia River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 83,891.00
    •      . . C.0.b Length of stream treated/protected .20
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Oregon Department of Fish and Wildlife, 2010-08-01, Lower Columbia River Conservation and Recovery Plan for Oregon Populations of Salmon and Steelhead; Oregon Department of Fish and Wildlife, 2016-01-01, Oregon Conservation Strategy ;
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 83,891.00
      •      . . . . C.4.b Total length of instream habitat treated .20
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .20
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 2
        •      . . . . . . C.4.d.7 Number of structures placed in channel 2

20220270    


  • Worksite Identifier: 20220270
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.36252275
  • Longitude: -122.02495466

ESU

  • Lower Columbia River Coho Salmon ESU
  • Lower Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 310,707.00
    •      . . C.0.b Length of stream treated/protected .50
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Oregon Department of Fish and Wildlife, 2010-08-01, Lower Columbia River Conservation and Recovery Plan for Oregon Populations of Salmon and Steelhead; Oregon Department of Fish and Wildlife, 2016-01-01, Oregon Conservation Strategy ;
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 310,707.00
      •      . . . . C.4.b Total length of instream habitat treated .50
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .03
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .19
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .50
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 7
        •      . . . . . . C.4.d.7 Number of structures placed in channel 7