North Santiam Instream Enhancement

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project IDOWEB 208-3090-8649
Recovery Domains -
Start Date01/13/2011
End Date03/07/2012
Year2010
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project modified or created a main stream channel; placed instream anchored habitat structures; placed large wood instream; placed rootwads instream.

Project Benefit    


The project seeks to benefit fish by adding instream large wood structures to increase habitat complexity and provide bank stability, stabalize banks using bioengineered solutions that utilize natural materials, and reconnect off-channel habitat and disconnected floodplains by removing fill and riprap.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 1.40 2.50

Funding Details

SourceFunds
State$98,688
Other$24,672
Report Total:$123,360


Project Map



Worksites

20110231    


  • Worksite Identifier: 20110231
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 44.79405081
  • Longitude: -122.63475034

ESU

  • Upper Willamette River Steelhead DPS
  • Upper Willamette River Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 123,360.00
    •      . . C.0.b Length of stream treated/protected 1.40
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Stout Creek Assessment and Restoration Plan/2009/River Design Group
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 123,360.00
      •      . . . . C.4.b Total length of instream habitat treated 1.40
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .08
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .00
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 1.40
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 24
        •      . . . . . . C.4.d.7 Number of structures placed in channel 60