Curry Large Wood Placement

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDOWEB 208-2090-6314
Recovery Domains -
Start Date06/30/2008
End Date04/07/2011
Year2007
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project installed riparian fencing; modified or created a main stream channel; placed instream anchored habitat structures; placed large wood instream; planted conifer and hardwood trees in the riparian area; planted conifer trees in the riparian area; planted riparian vegetation; stabilized a stream bank by installing log revetment.

Project Benefit    


OWRI: decrease run-off contaminant input; improve/increase stream gravel recruitment; improve/increase stream over-winter habitat; improve/increase stream pools; improve/increase stream rearing habitat; improve/increase stream structure & complexity; increase future LWD recruitment to stream; increase future stream shading/increase vegetation to provide shade;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 7.70
Riparian Habitat
  Stream Miles Treated 6.61
  Acres Treated 27.8

Funding Details

SourceFunds
State$204,793
Other$109,808
In-Kind Donated Labor$29,766
In-Kind Other$1,000
Report Total:$345,367


Project Map



Worksites

20100420    


  • Worksite Identifier: 20100420
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.41732379
  • Longitude: -124.37645696

ESU

  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 6,468.77
    •      . . C.0.b Length of stream treated/protected .17
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 6,468.77
      •      . . . . C.4.b Total length of instream habitat treated .17
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .17
        •      . . . . . . C.4.d.7 Number of structures placed in channel 6

20100423    


  • Worksite Identifier: 20100423
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.45645353
  • Longitude: -124.39481607

ESU

  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 17,856.22
    •      . . C.0.b Length of stream treated/protected .25
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 16,392.57
      •      . . . . C.4.b Total length of instream habitat treated .25
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .25
        •      . . . . . . C.4.d.7 Number of structures placed in channel 30
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 1,463.65
        •      . . . . C.5.b.1 Total riparian miles streambank treated .50
        •      . . . . C.5.b.2 Total Riparian Acres Treated 1.2
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Unknown
          •      . . . . . . C.5.c.3 Acres planted in riparian 1.2
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .50

20100427    


  • Worksite Identifier: 20100427
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.58016456
  • Longitude: -124.33894803

ESU

  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 13,287.86
    •      . . C.0.b Length of stream treated/protected .30
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 13,287.86
      •      . . . . C.4.b Total length of instream habitat treated .30
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .30
        •      . . . . . . C.4.d.7 Number of structures placed in channel 12

20100442    


  • Worksite Identifier: 20100442
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.95672638
  • Longitude: -124.45170173

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 11,982.82
    •      . . C.0.b Length of stream treated/protected .37
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Properly Functioning Condition Assessment/2003/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 7,472.35
      •      . . . . C.4.b Total length of instream habitat treated .37
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .37
        •      . . . . . . C.4.d.7 Number of structures placed in channel 8
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 4,510.47
        •      . . . . C.5.b.1 Total riparian miles streambank treated .74
        •      . . . . C.5.b.2 Total Riparian Acres Treated 1.8
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Sitka spruce, shore pine, Oregon ash.; Twinberry, willow.
          •      . . . . . . C.5.c.3 Acres planted in riparian 1.8
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .74
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .74
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing 1.8

20100418    


  • Worksite Identifier: 20100418
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.47093227
  • Longitude: -124.33788983

ESU

  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 7,216.76
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 7,216.76
      •      . . . . C.4.b Total length of instream habitat treated .10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
        •      . . . . . . C.4.d.7 Number of structures placed in channel 5

20100419    


  • Worksite Identifier: 20100419
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.48642912
  • Longitude: -124.38860235

ESU

  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 9,484.78
    •      . . C.0.b Length of stream treated/protected .40
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 8,981.11
      •      . . . . C.4.b Total length of instream habitat treated .40
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .40
        •      . . . . . . C.4.d.7 Number of structures placed in channel 20
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 503.67
        •      . . . . C.5.b.1 Total riparian miles streambank treated .80
        •      . . . . C.5.b.2 Total Riparian Acres Treated 1.0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Unknown
          •      . . . . . . C.5.c.3 Acres planted in riparian 1.0
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .80

20100421    


  • Worksite Identifier: 20100421
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.48026214
  • Longitude: -124.30600722

ESU

  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Southern Oregon / Northern California Coastal Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 12,839.82
    •      . . C.0.b Length of stream treated/protected .25
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 12,839.82
      •      . . . . C.4.b Total length of instream habitat treated .25
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .25
        •      . . . . . . C.4.d.7 Number of structures placed in channel 15

20100422    


  • Worksite Identifier: 20100422
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.95230652
  • Longitude: -124.45556374

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 99,407.09
    •      . . C.0.b Length of stream treated/protected 1.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River PFC Assessment/2003/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 78,442.41
      •      . . . . C.4.b Total length of instream habitat treated 1.00
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity 1.00
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .00
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 1.00
        •      . . . . . . C.4.d.7 Number of structures placed in channel 16
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 20,964.68
        •      . . . . C.5.b.1 Total riparian miles streambank treated 1.20
        •      . . . . C.5.b.2 Total Riparian Acres Treated 4.4
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Plantings included: Sitka spruce, Port Orford cedar, western red cedar, shore pine, hemlock, Douglas fir, big leaf maple, Oregon ash.; Plantings included: twinberry, ninebark, willow, crabapple, hawthorne, spirea, wax myrtle, evergreen huckleberry.
          •      . . . . . . C.5.c.3 Acres planted in riparian 4.4
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 1.20
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream 1.20
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing 4.4

20100424    


  • Worksite Identifier: 20100424
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.50204727
  • Longitude: -124.30621369

ESU

  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 13,269.06
    •      . . C.0.b Length of stream treated/protected .25
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 12,700.74
      •      . . . . C.4.b Total length of instream habitat treated .25
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .25
        •      . . . . . . C.4.d.7 Number of structures placed in channel 20
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 568.32
        •      . . . . C.5.b.1 Total riparian miles streambank treated .50
        •      . . . . C.5.b.2 Total Riparian Acres Treated .6
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Unknown
          •      . . . . . . C.5.c.3 Acres planted in riparian .6
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .50

20100425    


  • Worksite Identifier: 20100425
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.95400066
  • Longitude: -124.40498161

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 14,312.49
    •      . . C.0.b Length of stream treated/protected .52
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 14,312.49
      •      . . . . C.4.b Total length of instream habitat treated .52
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .52
        •      . . . . . . C.4.d.7 Number of structures placed in channel 12

20100426    


  • Worksite Identifier: 20100426
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.53638964
  • Longitude: -124.36797971

ESU

  • Southern Oregon / Northern California Coastal Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,619.66
    •      . . C.0.b Length of stream treated/protected .10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Euchre Creek Watershed Assessment/Action Plan/2001/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 3,619.66
      •      . . . . C.4.b Total length of instream habitat treated .10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
        •      . . . . . . C.4.d.7 Number of structures placed in channel 3

20100428    


  • Worksite Identifier: 20100428
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.57330172
  • Longitude: -124.34478128

ESU

  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Southern Oregon / Northern California Coastal Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 30,214.16
    •      . . C.0.b Length of stream treated/protected 1.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      South Coast Guide to Project Selection/1995/ODFW (Gold Beach District Office)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 26,575.71
      •      . . . . C.4.b Total length of instream habitat treated .67
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .67
        •      . . . . . . C.4.d.7 Number of structures placed in channel 17
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 3,638.45
        •      . . . . C.5.b.1 Total riparian miles streambank treated 1.00
        •      . . . . C.5.b.2 Total Riparian Acres Treated 9.7
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            hawthorne, spirea, ninebark, willow; Western red cedar, Sitka spruce, redwood, Oregon ash, bigleaf maple, vine maple.
          •      . . . . . . C.5.c.3 Acres planted in riparian 9.7
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 1.00

20100429    


  • Worksite Identifier: 20100429
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.56297519
  • Longitude: -124.36061203

ESU

  • Southern Oregon / Northern California Coastal Chinook Salmon ESU
  • Klamath Mountains Province Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 27,449.25
    •      . . C.0.b Length of stream treated/protected .65
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      South Coast Guide to Project Selection/1995/ODFW (Gold Beach District Office)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 13,287.86
      •      . . . . C.4.b Total length of instream habitat treated .10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .10
        •      . . . . . . C.4.d.7 Number of structures placed in channel 2
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .10
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 14,161.39
        •      . . . . C.5.b.1 Total riparian miles streambank treated .65
        •      . . . . C.5.b.2 Total Riparian Acres Treated 3.0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Redwood, Sitka spruce, western red cedar, Oregon ash, big leaf maple, vine maple, willow, cottonwood, spirea, ninebark, twinberry, hawthorne.
          •      . . . . . . C.5.c.3 Acres planted in riparian 3.0
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .50
        •      . . . . C.5.d.1 FencingY (Y/N)
          •      . . . . . . C.5.d.2 Miles of fence along stream .50
          •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing 3.0

20100430    


  • Worksite Identifier: 20100430
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.94075569
  • Longitude: -124.32411662

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 14,017.05
    •      . . C.0.b Length of stream treated/protected .51
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Floras Creek Watershed Assessment/Action Plan/2001/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 13,550.97
      •      . . . . C.4.b Total length of instream habitat treated .51
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .51
        •      . . . . . . C.4.d.7 Number of structures placed in channel 12
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 466.08
        •      . . . . C.5.b.1 Total riparian miles streambank treated .37
        •      . . . . C.5.b.2 Total Riparian Acres Treated 2.2
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Western red cedar, Oregon ash, Douglas fir
          •      . . . . . . C.5.c.3 Acres planted in riparian 2.2
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .37

20100431    


  • Worksite Identifier: 20100431
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.93986123
  • Longitude: -124.32861941

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 14,921.40
    •      . . C.0.b Length of stream treated/protected .56
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Floras Creek Watershed Assessment/Action Plan/2001/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 14,921.40
      •      . . . . C.4.b Total length of instream habitat treated .56
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .56
        •      . . . . . . C.4.d.7 Number of structures placed in channel 16

20100432    


  • Worksite Identifier: 20100432
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.94809674
  • Longitude: -124.34178466

ESU

  • Oregon Coast Steelhead DPS
  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,184.75
    •      . . C.0.b Length of stream treated/protected .25
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River Proper Functioning Condition Assessment; Curry Action Plan; Lower Rogue Action Plan
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 1,184.75
      •      . . . . C.4.b Total length of instream habitat treated .25
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .25
        •      . . . . . . C.4.d.7 Number of structures placed in channel 8

20100433    


  • Worksite Identifier: 20100433
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.75740388
  • Longitude: -124.41343128

ESU

  • Klamath Mountains Province Steelhead DPS
  • Oregon Coast Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 13,871.21
    •      . . C.0.b Length of stream treated/protected .30
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Elk River Watershed Assessment/Action Plan/2001/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 13,457.75
      •      . . . . C.4.b Total length of instream habitat treated .30
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .30
        •      . . . . . . C.4.d.7 Number of structures placed in channel 12
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 413.46
        •      . . . . C.5.b.1 Total riparian miles streambank treated .60
        •      . . . . C.5.b.2 Total Riparian Acres Treated 2.2
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Root rot resistant Port Orford cedar
          •      . . . . . . C.5.c.3 Acres planted in riparian 2.2
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .60

20100434    


  • Worksite Identifier: 20100434
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.87302212
  • Longitude: -124.46526824

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,179.52
    •      . . C.0.b Length of stream treated/protected .20
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      South Coast Guide to Project Selection/1995/ODFW (Gold Beach District Office)
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,954.00
      •      . . . . C.4.b Total length of instream habitat treated .20
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .20
        •      . . . . . . C.4.d.7 Number of structures placed in channel 6
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 225.52
        •      . . . . C.5.b.1 Total riparian miles streambank treated .20
        •      . . . . C.5.b.2 Total Riparian Acres Treated 1.5
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Port Orford cedar
          •      . . . . . . C.5.c.3 Acres planted in riparian 1.5
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .20

20100435    


  • Worksite Identifier: 20100435
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.89366563
  • Longitude: -124.47220377

ESU

  • Oregon Coast Chinook Salmon ESU
  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,017.90
    •      . . C.0.b Length of stream treated/protected .15
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Floras Creek Watershed Assessment/Action Plan/2001/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 5,017.90
      •      . . . . C.4.b Total length of instream habitat treated .15
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .15
        •      . . . . . . C.4.d.7 Number of structures placed in channel 3

20100436    


  • Worksite Identifier: 20100436
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.88834884
  • Longitude: -124.460438

ESU

  • Oregon Coast Steelhead DPS
  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,896.12
    •      . . C.0.b Length of stream treated/protected .15
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Floras Creek Watershed Assessment/Action Plan/2001/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 4,257.14
      •      . . . . C.4.b Total length of instream habitat treated .15
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .15
        •      . . . . . . C.4.d.7 Number of structures placed in channel 3
      •      . . . . C.4.e.1 Streambank stabilization Y (Y/N)
        •      . . . . . . C.4.e.2 Material Used For Streambank Stabilization (LOV)
        •      . . . . . . C.4.e.3 Miles of streambank stabilized .05
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 638.98
        •      . . . . C.5.b.1 Total riparian miles streambank treated .05
        •      . . . . C.5.b.2 Total Riparian Acres Treated .3
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Port Orford cedar, Sitka spruce, and Oregon ash were planted on top of bank; willow were planted on the sloped bank and amongst the large wood placements
          •      . . . . . . C.5.c.3 Acres planted in riparian .3
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting .05

20100437    


  • Worksite Identifier: 20100437
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.92358696
  • Longitude: -124.49379469

ESU

  • Oregon Coast Chinook Salmon ESU
  • Oregon Coast Steelhead DPS
  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 18,870.32
    •      . . C.0.b Length of stream treated/protected 1.10
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      New River PFC Assessment/2003/South Coast Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 18,870.32
      •      . . . . C.4.b Total length of instream habitat treated 1.10
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 1.10
        •      . . . . . . C.4.d.7 Number of structures placed in channel 7