Coquille Instream 2007
Salmonid Habitat Restoration and Acquisition
|
OWEB 207-286-5545 | - | 08/30/2007 | 12/10/2009 | 2006 | Completed | 04/12/2024 | |
| |
Description
This project excavated or blasted a pool; installed a log and rock/boulder flow deflector; installed a log flow deflector; installed a rock/boulder flow deflector; installed a rock/boulder V structure; modified or created a main stream channel; placed boulders instream; placed instream anchored habitat structures; placed large wood instream; reconnected side channels to the stream, or improved access to side channels.
Project Benefit
OWRI: improve/increase stream gravel recruitment; improve/increase stream interaction with floodplain; improve/increase stream over-winter habitat; improve/increase stream pools; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; improve/increase stream summer habitat;
Accomplishments
Instream Habitat |
Stream Miles Treated |
1.65 |
|
Funding Details |
State | $77,093 |
Other | $36,500 |
In-Kind Other | $4,000 |
Report Total: | $117,593 |
|
| |
Worksites
20090314
- Worksite Identifier: 20090314
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 42.75155858
- Longitude: -124.10128943
ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 70,971.78
- . . C.0.b
Length of stream treated/protected .80
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coquille Subbasin Plan 2007/2007/Coquille Tribe |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 70,971.78
- . . . . C.4.b
Total length of instream habitat treated .80
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .01
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .03
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 4
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .80
- . . . . . . C.4.d.7
Number of structures placed in channel 54
20090315
- Worksite Identifier: 20090315
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 42.97484997
- Longitude: -124.00615817
ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 17,488.81
- . . C.0.b
Length of stream treated/protected .25
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Coquille Subbasin Plan 2007/2007/Coquille Tribe |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 17,488.81
- . . . . C.4.b
Total length of instream habitat treated .25
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .25
- . . . . . . C.4.d.7
Number of structures placed in channel 85
20070531
- Worksite Identifier: 20070531
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 42.75168397
- Longitude: -124.09644742
ESU
- Lower Columbia River Coho Salmon ESU
- Oregon Coast Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 29,132.17
- . . C.0.b
Length of stream treated/protected .60
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
South Fork Coquille Watershed Analysis/1996/USFS |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 29,132.17
- . . . . C.4.b
Total length of instream habitat treated .60
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .01
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .06
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 0
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .60
- . . . . . . C.4.d.7
Number of structures placed in channel 21
|
|