Fate Creek Culvert Replacement (includes additional funds from project 203-019-578)

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement
Project IDOWEB 07-02-005-2670
Recovery Domains -
Start Date07/21/2003
End Date10/21/2004
Year2001
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project replaced culverts or structures with culverts placed embedded or flat.

Project Benefit    


OWRI: improve/increase fish passage;

Accomplishments

Metric Completed Originally
Proposed
Fish Passage
  Barriers Removed
  Miles Opened .50

Funding Details

SourceFunds
State$19,932
Report Total:$19,932


Project Map



Worksites

20050823    


  • Worksite Identifier: 20050823
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 42.98777706
  • Longitude: -123.10307635

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 19,932.00
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Not Asked At Application
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 19,932.00
      •      . . . . C.2.b.1 Length of stream made accessible .50
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade .50