Tumalo Cr Restoration: Phases III & IV

Salmonid Habitat Restoration and Acquisition

Instream Habitat Riparian Habitat
Project IDOWEB 205-053-1161
Recovery Domains -
Start Date11/02/2004
End Date03/05/2008
Year2004
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project placed large wood instream; planted riparian vegetation.

Project Benefit    


OWRI: decrease erosion/stream sedimentation; improve/increase stream interaction with floodplain; improve/increase stream pools; improve/increase stream rearing habitat; improve/increase stream spawning habitat; improve/increase stream structure & complexity; increase future LWD recruitment to stream; increase future stream shading/increase vegetation to provide shade; increase streambank stabilization/protection;

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 2.80
Riparian Habitat
  Stream Miles Treated 5.60
  Acres Treated 67.0

Funding Details

SourceFunds
PCSRF$5,952
State$173,648
Other$296,838
In-Kind Other$65,257
Report Total:$541,695


Project Map



Worksites

20070030    


  • Worksite Identifier: 20070030
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 44.03246676
  • Longitude: -121.54286507

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 541,694.99
    •      . . C.0.b Length of stream treated/protected 2.80
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Upper Deschutes Subbasin Assessment/2003/Upper Deschutes Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 323,119.59
      •      . . . . C.4.b Total length of instream habitat treated 2.80
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.80
        •      . . . . . . C.4.d.7 Number of structures placed in channel 2,100
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding 218,575.40
        •      . . . . C.5.b.1 Total riparian miles streambank treated 5.60
        •      . . . . C.5.b.2 Total Riparian Acres Treated 67.0
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
            Native Grass Seed;
          •      . . . . . . C.5.c.3 Acres planted in riparian 67.0
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting 5.60