Tenmile Lakes WS Riparian Enhancement & Upslope Erosion

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Riparian Habitat Upland Habitat And Sediment
Project IDOWEB 203-142-638
Recovery Domains -
Start Date04/18/2003
End Date01/27/2005
Year2000
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project developed an off-channel watering site; installed riparian fencing; removed culverts or structures and did not replace them; replaced culverts or structures with a bridge; replaced culverts or structures with culverts placed embedded or flat.

Project Benefit    


OWRI: improve/increase fish passage; improve/increase stream rearing habitat; improve/increase stream spawning habitat; increase streambank stabilization/protection;

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated 1.40
  Acres Treated 7.0
Upland Habitat
  Acres Treated .2
Fish Passage
  Barriers Removed
  Miles Opened 10.00

Funding Details

SourceFunds
PCSRF$808
State$90,807
Other$23,208
In-Kind Other$39,473
Report Total:$154,296


Project Map



Worksites

20040454    


  • Worksite Identifier: 20040454
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 43.60781224
  • Longitude: -124.06159108

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 25,418.64
    •      . . C.0.b Length of stream treated/protected .70
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Tenmile Lakes Riparian and Sediment Source Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 19,064.58
      •      . . . . C.5.b.1 Total riparian miles streambank treated 1.40
      •      . . . . C.5.b.2 Total Riparian Acres Treated 7.0
      •      . . . . C.5.d.1 FencingY (Y/N)
        •      . . . . . . C.5.d.2 Miles of fence along stream 1.40
        •      . . . . . . C.5.d.3 Acres of riparian area protected by fencing 7.0
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 6,354.06
        •      . . . . C.6.b.1 Acres of upland habitat area treated .2
        •      . . . . C.6.j.1 Upland livestock management Y (Y/N)
          •      . . . . . . C.6.j.2 Upland livestock management action(s) taken (LOV)
          •      . . . . . . C.6.j.4 Number of livestock water installations/developments 2

20040455    


  • Worksite Identifier: 20040455
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 43.61940135
  • Longitude: -124.1044551

ESU

  • Lower Columbia River Coho Salmon ESU
  • Oregon Coast Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 57,875.89
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Tenmile Lakes Riparian and Sediment Source Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 57,875.89
      •      . . . . C.2.b.1 Length of stream made accessible 3.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 2
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 2
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 3.00

20040456    


  • Worksite Identifier: 20040456
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 43.61958161
  • Longitude: -124.18607331

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,814.62
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Tenmile Lakes Riparian and Sediment Source Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 23,814.62
      •      . . . . C.2.b.1 Length of stream made accessible 2.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 2.00

20040457    


  • Worksite Identifier: 20040457
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 43.61464553
  • Longitude: -124.18516691

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 21,360.29
    •      . . C.0.b Length of stream treated/protected .01
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Tenmile Lakes Riparian and Sediment Source Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 21,360.29
      •      . . . . C.2.b.1 Length of stream made accessible 3.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
      •      . . . . C.2.f.1 Culvert installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.f.2 Number of culverts installed or improved 1
        •      . . . . . . C.2.f.3 Miles of stream made accessible by culvert installation/upgrade 3.00

20040458    


  • Worksite Identifier: 20040458
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 43.58960903
  • Longitude: -124.11291301

ESU

  • Lower Columbia River Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 25,826.50
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Tenmile Lakes Riparian and Sediment Source Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 25,826.50
      •      . . . . C.2.b.1 Length of stream made accessible 2.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 2
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 2.00
      •      . . . . C.2.i.1 Road stream crossing removal Y (Y/N)
        •      . . . . . . C.2.i.2 Number of road crossings removed 1
        •      . . . . . . C.2.i.3 Miles of stream made accessible by road stream crossing removal 2.00