Tieman Cr Fish Passage & Sediment Control

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Upland Habitat And Sediment
Project IDOWEB 203-066-598
Recovery Domains -
Start Date10/21/2002
End Date05/27/2003
Year2002
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project added a permanent cross-drain above a stream crossing; pulled back and stabilized a road; removed culverts or structures and did not replace them; replaced culverts or structures with a bridge.

Project Benefit    


OWRI: decrease erosion/stream sedimentation; decrease road access; decrease run-off contaminant input; decrease washout/diversion potential at stream crossings; improve/increase fish passage; increase road/upslope drainage; increase upslope stability (soil, road);

Accomplishments

Metric Completed Originally
Proposed
Upland Habitat
  Acres Treated 1.3
Fish Passage
  Barriers Removed
  Miles Opened 4.00

Funding Details

SourceFunds
State$30,965
In-Kind Other$15,337
Report Total:$46,302


Project Map



Worksites

20030935    


  • Worksite Identifier: 20030935
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.52275037
  • Longitude: -121.55933074

ESU

  • Oregon Coast Coho Salmon ESU
  • Lower Columbia River Steelhead DPS
  • Lower Columbia River Chinook Salmon ESU
  • Unknown

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 46,302.31
    •      . . C.0.b Length of stream treated/protected .02
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Hood River Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding 37,042.25
      •      . . . . C.2.b.1 Length of stream made accessible 4.00
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 2
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded 1
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade 4.00
      •      . . . . C.2.i.1 Road stream crossing removal Y (Y/N)
        •      . . . . . . C.2.i.2 Number of road crossings removed 1
        •      . . . . . . C.2.i.3 Miles of stream made accessible by road stream crossing removal 4.00
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 9,260.06
        •      . . . . C.6.b.1 Acres of upland habitat area treated 1.3
        •      . . . . C.6.b.2 Miles of road treated in upland area .11
        •      . . . . C.6.c.1 Road drainage system improvements and reconstructionY (Y/N)
          •      . . . . . . C.6.c.2 Miles of road treated for drainage system improvements and reconstruction .11