Walla Walla IDWC

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Fish Screening Instream Flow Upland Habitat And Sediment
Project IDOWEB 200-188-113
Recovery Domains -
Start Date02/08/2001
End Date09/16/2003
Year2000
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


This project improved an irrigation system; improved an irrigation system by converting from dirt ditch to pipeline delivery; improved an irrigation system by converting from flood to sprinkler irrigation; installed a new fish screen where no screen had existed previously; removed a push-up dam permanently; transferred or leased an instream water right.

Project Benefit    


OWRI: improve/increase fish passage; improve/increase stream flow; provide fish protection (e.g. by screening diversions);

Accomplishments

Metric Completed Originally
Proposed
Upland Habitat
  Acres Treated 536.0
Fish Passage
  Barriers Removed 1
  Miles Opened 74.00
Fish Screens
  Screens Installed 1

Funding Details

SourceFunds
State$290,482
Other$285,787
In-Kind Other$275,177
Report Total:$851,446


Project Map



Worksites

20030796    


  • Worksite Identifier: 20030796
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.95169533
  • Longitude: -118.39052827

ESU

  • Middle Columbia River Steelhead DPS
  • Mid-Columbia River Spring-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 785,555.53
    •      . . C.0.b Length of stream treated/protected 44.60
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Walla Walla Basin Action Plan/1999/Walla Walla Basin Watershed Council
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.1 Fish Screening ProjectY (Y/N)
      •      . . . . C.1.a Fish screen funding .00
      •      . . . . C.1.c.1 Fish screens installedY (Y/N)
        •      . . . . . . C.1.c.2 Number of new fish screens installed 1
        •      . . . . . . C.1.c.3 Flow rate of screened water 0 (cfs)
      •      . . C.2 Fish Passage ImprovementY (Y/N)
        •      . . . . C.2.a Fish Passage Funding 135,328.99
        •      . . . . C.2.b.1 Length of stream made accessible 74.00
        •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
        •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage 1
        •      . . . . C.2.c.1 Fish passage blockages removed or altered (other than road crossings reported in C.2.f to C.2.i)Y (Y/N)
          •      . . . . . . C.2.c.2 Number of blockages/impediments/barriers removed/altered 1
        •      . . C.3 Instream Flow ProjectY (Y/N)
          •      . . . . C.3.a Instream Flow Funding .00
          •      . . . . C.3.b Length of stream 'protected' for adequate flow 44.60
          •      . . . . C.3.c Change in water flow4.74 (cfs)
          •      . . . . C.3.f.1 Water leased or purchasedY (Y/N)
            •      . . . . . . C.3.f.4 Start date of no withdrawal06/30/2003 (mm/dd/yyyy)
            •      . . . . . . C.3.f.5 End date of no withdrawal.12/31/9999 (mm/dd/yyyy)
          •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
            •      . . . . C.6.a Upland Habitat / Sediment Funding 650,226.54
            •      . . . . C.6.b.1 Acres of upland habitat area treated 446.0
            •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
              •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
              •      . . . . . . C.6.i.3 Upland acres managed for agriculture 263.0

20011005    


  • Worksite Identifier: 20011005
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 45.96056636
  • Longitude: -118.3839221

ESU

  • Middle Columbia River Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 65,890.48
    •      . . C.0.b Length of stream treated/protected 44.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Walla Walla Basin Action Plan/1999/Walla Walla Basin WC
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.3 Instream Flow ProjectY (Y/N)
      •      . . . . C.3.a Instream Flow Funding 193.78
      •      . . . . C.3.b Length of stream 'protected' for adequate flow 44.00
      •      . . . . C.3.c Change in water flow.56 (cfs)
      •      . . . . C.3.f.1 Water leased or purchasedY (Y/N)
        •      . . . . . . C.3.f.4 Start date of no withdrawal12/31/2001 (mm/dd/yyyy)
        •      . . . . . . C.3.f.5 End date of no withdrawal.12/31/2002 (mm/dd/yyyy)
      •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
        •      . . . . C.6.a Upland Habitat / Sediment Funding 65,696.70
        •      . . . . C.6.b.1 Acres of upland habitat area treated 90.0
        •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
          •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
          •      . . . . . . C.6.i.3 Upland acres managed for agriculture 90.0