Willapa River Mile 35 Instream and Riparian Design
Salmonid Restoration Planning and Assessments
|
22-1581 P | - | 09/22/2022 | 03/22/2024 | 2022 | Ongoing | 04/12/2024 | |
| |
Description
To address poor in stream and riparian habitat conditions seen along the Seiler Family owned reach of the mainstem Willapa River (RM 35) we will develop a preliminary design set and basis of design (BOD) report detailing locations for large wood debris that could immediately improve in stream habitat conditions for chinook, chum, coho, and steelhead. The design report will also include specifications for riparian restorations practices that will provide near term shade, future large woody debris inputs and management of invasive species.
Project Benefit
Develop preliminary instream and riparian restoration designs for 1.1 miles of Willapa River restoration to address bank erosion, lack of large wood, and channel incision as the preliminary step in improving spawning and rearing habitat for adult Coho and Winter Steelhead as well as juvenile Coho, Winter Steelhead, and Fall Chinook.
Funding Details |
PCSRF | $168,300 |
Other | $29,700 |
Report Total: | $198,000 |
|
| |
Worksites
1-Seiler Willapa River Farm
- Worksite Identifier: 1-Seiler Willapa River Farm
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 46.55286667
- Longitude: -123.53515776
ESU
- Washington Coast Chinook Salmon ESU
- Southwest Washington Coho Salmon ESU
- Pacific Coast Chum Salmon ESU
- Southwest Washington Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
|
|