Willapa River Mile 35 Instream and Riparian Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID22-1581 P
Recovery Domains -
Start Date09/22/2022
End Date03/22/2024
Year2022
StatusOngoing
Last Edited04/12/2024
 
1 - 1

Description    


To address poor in stream and riparian habitat conditions seen along the Seiler Family owned reach of the mainstem Willapa River (RM 35) we will develop a preliminary design set and basis of design (BOD) report detailing locations for large wood debris that could immediately improve in stream habitat conditions for chinook, chum, coho, and steelhead. The design report will also include specifications for riparian restorations practices that will provide near term shade, future large woody debris inputs and management of invasive species.

Project Benefit    


Develop preliminary instream and riparian restoration designs for 1.1 miles of Willapa River restoration to address bank erosion, lack of large wood, and channel incision as the preliminary step in improving spawning and rearing habitat for adult Coho and Winter Steelhead as well as juvenile Coho, Winter Steelhead, and Fall Chinook.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$168,300
Other$29,700
Report Total:$198,000


Project Map



Worksites

1-Seiler Willapa River Farm    


  • Worksite Identifier: 1-Seiler Willapa River Farm
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.55286667
  • Longitude: -123.53515776

ESU

  • Washington Coast Chinook Salmon ESU
  • Southwest Washington Coho Salmon ESU
  • Pacific Coast Chum Salmon ESU
  • Southwest Washington Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented