Asotin Creek PA 11.2 Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID22-1010 P
Recovery Domains -
Start Date09/22/2022
End Date06/15/2024
Year2022
StatusOngoing
Last Edited04/12/2024
 
1 - 1

Description    


The Asotin County Conservation District is sponsoring the Asotin Creek Project Area 11.2 Stream Restoration Design Project to develop a final design and basis of design report, and complete environmental compliance including permits and cultural resource requirements. The priority species that will benefit from the project, once implemented, is Snake River Basin Steelhead and possibly ESA listed Spring/Summer chinook and bull trout. This grant will target 1.4 miles, from RM 14.2 to RM 15.6, of priority restoration reach Asotin Creek located south of the City of Asotin, WA along Asotin Creek Road, that flows directly into the Snake River. The project will advance the conceptual plan for PA 11.2 which includes improving access to side channels, controlling invasive and upland vegetation encroachment, and add large woody debris to increase in-stream complexity.

Project Benefit    


The goal of this project is to increase access to side and flood channels which will improve floodplain connection, promote riparian function, and provide instream habitat complexity through the placement of structures to enhance juvenile Snake River steelhead habitat for all life stages.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$96,000
Other$24,000
Report Total:$120,000


Project Map



Worksites

1-Asotin Creek PA 11.2    


  • Worksite Identifier: 1-Asotin Creek PA 11.2
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.27554915
  • Longitude: -117.29108255

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented