Asotin Creek PA 11.2 Design
Salmonid Restoration Planning and Assessments
|
22-1010 P | - | 09/22/2022 | 06/15/2024 | 2022 | Ongoing | 04/12/2024 | |
| |
Description
The Asotin County Conservation District is sponsoring the Asotin Creek Project Area 11.2 Stream Restoration Design Project to develop a final design and basis of design report, and complete environmental compliance including permits and cultural resource requirements. The priority species that will benefit from the project, once implemented, is Snake River Basin Steelhead and possibly ESA listed Spring/Summer chinook and bull trout. This grant will target 1.4 miles, from RM 14.2 to RM 15.6, of priority restoration reach Asotin Creek located south of the City of Asotin, WA along Asotin Creek Road, that flows directly into the Snake River. The project will advance the conceptual plan for PA 11.2 which includes improving access to side channels, controlling invasive and upland vegetation encroachment, and add large woody debris to increase in-stream complexity.
Project Benefit
The goal of this project is to increase access to side and flood channels which will improve floodplain connection, promote riparian function, and provide instream habitat complexity through the placement of structures to enhance juvenile Snake River steelhead habitat for all life stages.
Funding Details |
PCSRF | $96,000 |
Other | $24,000 |
Report Total: | $120,000 |
|
| |
Worksites
1-Asotin Creek PA 11.2
- Worksite Identifier: 1-Asotin Creek PA 11.2
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 46.27554915
- Longitude: -117.29108255
ESU
- Snake River Basin Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding
- . . B.0.b.1
Area Encompassed
- . . B.0.b.2
Stream Miles Affected
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
|
|
|