Old Tyonek Creek Tributary Culvert Survey and Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination Salmonid Habitat Assessment / Inventory
Project IDAK56010
Recovery Domains -
Start Date03/01/2023
End Date05/31/2024
Year2022
StatusOngoing
Last Edited03/13/2024
 
1 - 1

Description    


This project will fund the culvert design and engineering process to replace ADF&G culvert #20601535 located on a tributary of Old Tyonek Creek in West Cook Inlet and perform related juvenile salmon surveys.

Project Benefit    


This project will provide design and engineering plans for a culvert replacement that will make accessible the full extent of salmon habitat along an Old Tyonek Creek tributary, reconnecting 1.4 km of stream and 1.4 ha of wetlands. A fish-friendly culvert will restore self-sustaining natural ecosystem function and processes along this creek tributary and wetland area and ensure that the connectivity between both sides of the road is maintained so anadromous fishes are able to easily move through habitat as needed for their growth and survival.

Accomplishments

Metric Completed Originally
Proposed
Planning and Assessment
  Stream Miles Assessed .60

Funding Details

SourceFunds
PCSRF$67,500
Other$23,625
Report Total:$91,125


Project Map



Worksites

52653665    


  • Worksite Identifier: 52653665
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Western Cook Inlet (190206)
  • Subbasin: Redoubt-Trading Bays (19020601)
  • Watershed: Old Tyonek Creek-Frontal Cook Inlet (1902060119)
  • Subwatershed: Old Tyonek Creek (190206011903)
  • State: Alaska
  • Recovery Domain:
  • Latitude: 61.066578
  • Longitude: -151.32608

ESU

  • Un-Named ESU Coho

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
      •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
        •      . . . . B.2.a Habitat Assessment Funding
        •      . . . . B.2.c Instream SurveyY (Y/N)
          •      . . . . . . B.2.c.1 Type of instream survey (LOV)
          •      . . . . . . B.2.c.2 Stream miles assessed