The Nez Perce Soil and Water Conservation District will complete designs for three sites within the Clearwater Subbasin (one site on Bedrock Creek and two sites on Lapwai Creek). Site 1 includes a design for habitat treatments on a 0.54 mile segment of Bedrock Creek located 0.34 miles upstream from the confluence of Bedrock Creek and the Clearwater River. Site 2 includes a design for in-stream habitat treatments for 0.75 miles and Site 3 is a design for 2 miles of road erosion control. Sites 2 and 3 are located on Sweetwater Creek, a tributary to Lapwai Creek within the Clearwater Subbasin. Current habitat conditions include lack of woody material, lack of riparian vegetation, a partially disengaged floodplain, elevated water temperatures, and lack of juvenile steelhead refugia.



Project actions include: 1) final design for habitat treatments on a 0.54 mile segment of Bedrock Creek, 2) final design for instream habitat treatments on 0.75 miles of Sweetwater Creek, and 3) final design for 2 miles of road erosion control on Sweetwater Creek.

Project Benefit    


Improving the project sites through development of a restored floodplain will increase the stream’s processes and function (Site 1). Developing habitat complexity in the form of woody debris structures and planting of riparian zones will improve survival of juveniles in summer rearing months and overwintering as well (Sites 1, 2). An established riparian zone will provide long-term sources of woody debris, food sources for macro-invertebrates and provide shade to the stream to lower stream temperatures and improve summer juvenile steelhead survival (Sites 1,2). The designs for all sites addresses the juvenile steelhead summer and overwintering life stages through the development of instream habitat and floodplain diversity and sediment reductions.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$60,200
Other$63,758
Report Total:$123,958


Project Map



Worksites

1 of 3; Bedrock Creek    


  • Worksite Identifier: 1 of 3; Bedrock Creek
  • Start Date: 12/16/2022
  • End Date: 10/31/2025
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Clearwater (170603)
  • Subbasin: Clearwater (17060306)
  • Watershed: Lower Clearwater River (1706030613)
  • Subwatershed: Catholic Creek-Clearwater River (170603061308)
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 46.532962
  • Longitude: -116.8572464

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

2 of 3; Sweetwater Crk    


  • Worksite Identifier: 2 of 3; Sweetwater Crk
  • Start Date: 12/16/2022
  • End Date: 10/31/2025
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Lower Snake (170601)
  • Subbasin: Lower Snake-Asotin (17060103)
  • Watershed: Captain John Creek-Snake River (1706010303)
  • Subwatershed: Captain John Creek (170601030301)
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 46.183096
  • Longitude: -116.847402

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented

3 of 3; Sweetwater Rd    


  • Worksite Identifier: 3 of 3; Sweetwater Rd
  • Start Date: 12/16/2022
  • End Date: 10/31/2025
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Clearwater (170603)
  • Subbasin: Clearwater (17060306)
  • Watershed: Lapwai Creek (1706030612)
  • Subwatershed: Sweetwater Creek (170603061205)
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 46.294353
  • Longitude: -116.847402

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding .00
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented