SQ Creek Aquatic Organism Passage Improvement Project

Salmonid Habitat Restoration and Acquisition

Fish Passage Improvement Riparian Habitat
Project ID007 22 SA
Recovery DomainsSnake River
Start Date12/16/2022
End Date12/31/2024
Year2022
StatusOngoing
Last Edited02/27/2024
 
1 - 1

Description    


The SQ Creek Aquatic Organism Passage Improvement Project will replace two complete fish barriers with bridges to restore fish passage for all life stages of resident, fluvial, and anadromous fish. SQ Creek is a tributary to the Salmon River in rural Idaho near the town of North Fork. This is a collaborative project with Idaho Department of Fish and Game, the Upper Salmon Basin Watershed Program, and the Salmon-Challis National Forest. SQ Creek is a large and important tributary to Idaho’s Salmon River, and is designated as critical habitat for Snake River Chinook Salmon and steelhead, and Columbia Basin Bull trout. Two corrugated metal pipes located less than 300’ apart at the mouth of SQ Creek have resulted in 9.5 miles of habitat being inaccessible to all life stages (both juvenile and adult). The crossings are undersized, poorly aligned, and result in deleterious effects to the habitat conditions. Once implemented, almost 10 miles of habitat will be reconnected for all life stages of fish. This is one of the last few remaining tributaries to the Salmon River on Salmon-Challis National Forest administered lands that lacks connectivity at the mouth.

Project Benefit    


The goal of the SQ Creek Aquatic Organism Passage Improvement Project is to replace two fish barriers in SQ Creek with bridges to restore fish passage for all life stages of resident, fluvial, and anadromous fish. Project outcomes are to effectively provide aquatic organism passage into SQ Creek. This is critical for endangered fish species in the Salmon River Basin due to the creeks’ unaltered state upstream of the culverts, and cold water refugia during the summer months when the Salmon River reached lethal temperatures for cold water fish species. Providing access to SQ Creek will also provide spawning and rearing habitat for Chinook salmon, steelhead, Westslope Cutthroat trout, and bull trout. The intent is to ensure that the cross sections of the constructed bedforms match those in the reference reach of the creek. Reconnection will also allow isolated fish populations to express fluvial life histories.

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated .32
  Acres Treated .2
Fish Passage
  Barriers Removed
  Miles Opened 10.05

Funding Details

SourceFunds
State$183,000
Other$150,000
Report Total:$333,000


Project Map



Worksites

SQ Creek Lower, 1 of 2    


  • Worksite Identifier: SQ Creek Lower, 1 of 2
  • Start Date: 05/01/2024
  • End Date: 10/30/2024
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Salmon (170602)
  • Subbasin: Middle Salmon-Panther (17060203)
  • Watershed: Indian Creek-Salmon River (1706020307)
  • Subwatershed: Bia Po’i Naokwaide (170602030704)
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 45.399014
  • Longitude: -114.169439

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Spring/Summer-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding
      •      . . . . C.2.b.1 Length of stream made accessible
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
          •      . . . . . . C.5.c.3 Acres planted in riparian
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting

SQ Creek upper, 2 of 2    


  • Worksite Identifier: SQ Creek upper, 2 of 2
  • Start Date: 05/01/2024
  • End Date: 10/30/2024
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Salmon (170602)
  • Subbasin: Middle Salmon-Panther (17060203)
  • Watershed: Indian Creek-Salmon River (1706020307)
  • Subwatershed: Bia Po’i Naokwaide (170602030704)
  • State: Idaho
  • Recovery Domain: Snake River
  • Latitude: 45.399258
  • Longitude: -114.170299

ESU

  • Snake River Basin Steelhead DPS
  • Snake River Spring/Summer-run Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding .00
    •      . . C.0.b Length of stream treated/protected
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.2 Fish Passage ImprovementY (Y/N)
      •      . . . . C.2.a Fish Passage Funding
      •      . . . . C.2.b.1 Length of stream made accessible
      •      . . . . C.2.b.3 Type of blockage/barrier (LOV)
      •      . . . . C.2.b.4 Number of blockages/impediments/barriers impeding passage
      •      . . . . C.2.g.1 Bridge installed or improved at road stream crossingY (Y/N)
        •      . . . . . . C.2.g.2 Number of bridges installed or improved/upgraded
        •      . . . . . . C.2.g.3 Miles of stream made accessible by bridge installation or improvement/upgrade
      •      . . C.5 Riparian Habitat ProjectY (Y/N)
        •      . . . . C.5.a Riparian Habitat Funding
        •      . . . . C.5.b.1 Total riparian miles streambank treated
        •      . . . . C.5.b.2 Total Riparian Acres Treated
        •      . . . . C.5.c.1 Riparian plantingY (Y/N)
          •      . . . . . . C.5.c.2
            Species of plants planted in riparian
          •      . . . . . . C.5.c.3 Acres planted in riparian
          •      . . . . . . C.5.c.4 Miles of streambank treated with riparian planting