Knotweed Control and Riparian Enhancement

Salmonid Habitat Restoration and Acquisition

Riparian Habitat
Project ID08-1994 R
Recovery Domains -
Start Date12/11/2008
End Date05/05/2011
Year2008
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


The goal of this project was to identify and treat all knotweed infestations in the Dewatto and Union Rivers.

Need: Compared to native plant species, knotweed shows a decreased ability to control erosion despite having an extensive root system. During flood events, plant fragments are washed downstream where rhizome and stem pieces create new infestations. Increased sediment is a factor in the loss of productive salmonid habitat. Sediment can fill in the spaces between riverbed spawning gravels and fill in pools used for rearing. It negatively affects salmonids by smothering viable eggs, decreasing their feeding success, and damaging gill filaments. Knotweed negatively affects aquatic invertebrates that compose the basis of the aquatic food chain by an alteration of the quality and timing of the leaf litter regime. This alteration changes nutrient inputs and soil composition. Invertebrates are the primary food source of juvenile fish species.
Outcomes: Location, Control, Monitoring of Knotweed infestation, and restoration of riparian corridors. Best science demands a three year control cycle.

Project Benefit    


The goal of this project was to identify and treat all knotweed infestations in the Dewatto and Union Rivers and begin a three year treatment cycle.

Accomplishments

Metric Completed Originally
Proposed
Riparian Habitat
  Stream Miles Treated 16.90 114.00
  Acres Treated 77.7 .0

Funding Details

SourceFunds
PCSRF$90,000
Other$45,999
In-Kind Volunteers$5,788
In-Kind Donated Labor$14,733
In-Kind Other$22,096
Report Total:$178,616


Project Map



Worksites

1-West WRIA 15 Tahuya-Dewatto    


  • Worksite Identifier: 1-West WRIA 15 Tahuya-Dewatto
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 47.46882448
  • Longitude: -123.02758504

ESU

  • Hood Canal Summer-run Chum Salmon ESU
  • Puget Sound Chinook Salmon ESU
  • Puget Sound/Strait of Georgia Coho Salmon ESU
  • Puget Sound Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 81,413.00
    •      . . C.0.b Length of stream treated/protected 26.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Cherney, 2009, Hood Canal regional Knotweed Control Strategy, Hood Canal Coordinating Council 17791 Fjord Dr Box HH Poulsbo, WA 98370-8481
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 81,413.00
      •      . . . . C.5.b.1 Total riparian miles streambank treated 12.00
      •      . . . . C.5.b.2 Total Riparian Acres Treated 1.7
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.2
          Species of plants treated/removed in riparian
          Polygonium bohemicum
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control 1.7

2-West WRIA 15 Union-Mission     


  • Worksite Identifier: 2-West WRIA 15 Union-Mission
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 47.45210661
  • Longitude: -122.83394724

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 97,203.00
    •      . . C.0.b Length of stream treated/protected 6.00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Cherney, 2009, Hood Canal regional Knotweed Control Strategy, Hood Canal Coordinating Council 17791 Fjord Dr Box HH Poulsbo, WA 98370-8481
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.5 Riparian Habitat ProjectY (Y/N)
      •      . . . . C.5.a Riparian Habitat Funding 97,203.00
      •      . . . . C.5.b.1 Total riparian miles streambank treated 4.90
      •      . . . . C.5.b.2 Total Riparian Acres Treated 76.0
      •      . . . . C.5.h.1 Riparian plant removal/controlY (Y/N)
        •      . . . . . . C.5.h.2
          Species of plants treated/removed in riparian
          Polygonium bohemicum
        •      . . . . . . C.5.h.3 Acres of riparian treated for plant removal/control 76.0