Upland Sediment Reduction Program

Salmonid Habitat Restoration and Acquisition

Upland Habitat And Sediment
Project ID00-1179 R
Recovery Domains -
Start Date03/18/2000
End Date06/10/2001
Year2000
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


The Pomeroy Conservation District used this funding to reduce erosion from upland croplands. A large amount of the sediment generated from upland erosion reaches fish-bearing streams within the district. Two of these streams have documented steelhead populations while two others had populations in the past. Sediment in the streams greatly reduces spawning and rearing habitat.
Forty-three producers used the cost share program associated with this grant to reduce sediment run off into fish-bearing streams
· Direct seeding took place on 3,090 acres (i.e., cropland underwent a two-pass operation-fertilizer application and then seeding with a heavy drill).
· No-till seeding took place on 3,227 acres (i.e., cropland was treated with Roundup herbicide to kill all vegetation before seeding, eliminating the need for cultivation; the ground was then fertilized and seeded in one pass using a no-till drill).
· Four level-terrace projects were rebuilt to original NRCS specifications.
· One grassed waterway was constructed.
· Two sediment basin projects were constructed.
Taking all these best management practices into consideration, the overall sediment from upland soil erosion was reduced by 85% compared to these same acres being prepared and seeded using the conventional cultivation practices.

Project Benefit    


The goal of the project is to reduce sediment delivery to the stream from upland land uses. The objective of the project is to control sources and delivery of sedimentation and erosion.

Accomplishments

Metric Completed Originally
Proposed
Upland Habitat
  Acres Treated 6,617.0 5,754.0

Funding Details

SourceFunds
State$84,900
Report Total:$84,900


Project Map



Worksites

42-Ken Beale #42    


  • Worksite Identifier: 42-Ken Beale #42
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude:
  • Longitude:

ESU

    No ESU data was found for this worksite.

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,957.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 3,957.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 263.8
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 263.8

10-Paul & Barbara Kimble #10    


  • Worksite Identifier: 10-Paul & Barbara Kimble #10
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.49411006
  • Longitude: -117.44308711

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,611.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,611.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 107.4
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 107.4

23-Wynn Stallcop #23    


  • Worksite Identifier: 23-Wynn Stallcop #23
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.51185535
  • Longitude: -117.40083357

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,054.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,054.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 205.4
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 205.4

6-4 Aces #6    


  • Worksite Identifier: 6-4 Aces #6
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.72863359
  • Longitude: -117.5103689

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,930.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,930.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 293.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 293.0

18-L. Koller Farms #18    


  • Worksite Identifier: 18-L. Koller Farms #18
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.64439627
  • Longitude: -117.60676186

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,430.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,430.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 90.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 90.0

34-Koller Burt Partnership #34    


  • Worksite Identifier: 34-Koller Burt Partnership #34
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.6530064
  • Longitude: -117.55578203

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 790.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 790.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 25.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 25.0

26-McGreevey Ranches #26    


  • Worksite Identifier: 26-McGreevey Ranches #26
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.47836913
  • Longitude: -117.34320594

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,000.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 5,000.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 333.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 333.0

25-Dale & Phil Heitstuman #25    


  • Worksite Identifier: 25-Dale & Phil Heitstuman #25
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.48395168
  • Longitude: -117.38505424

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,017.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,017.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 67.8
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 67.8

36-4 Aces #36    


  • Worksite Identifier: 36-4 Aces #36
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.65341976
  • Longitude: -117.59613251

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 675.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 675.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 45.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 45.0

43-McKeirnan Farms #43    


  • Worksite Identifier: 43-McKeirnan Farms #43
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.47942409
  • Longitude: -117.43006073

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,000.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 4,000.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 400.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 400.0

1-Tom Herres #1    


  • Worksite Identifier: 1-Tom Herres #1
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.45780486
  • Longitude: -117.4335699

ESU

  • Snake River Spring/Summer-run Chinook Salmon ESU
  • Snake River Fall Chinook Salmon ESU
  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 314.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 314.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 25.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 25.0

20-Mark Ledgerwood #20    


  • Worksite Identifier: 20-Mark Ledgerwood #20
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.48751604
  • Longitude: -117.33461033

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,730.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,730.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 182.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 182.0

22-L. Koller Farms #22    


  • Worksite Identifier: 22-L. Koller Farms #22
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.5537627
  • Longitude: -117.40358027

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,103.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,103.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 140.2
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 140.2

14-Scott Farms, Inc. #14    


  • Worksite Identifier: 14-Scott Farms, Inc. #14
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.52071357
  • Longitude: -117.3471816

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,000.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 5,000.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 333.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 333.0

39-Tetrick Inc. #39    


  • Worksite Identifier: 39-Tetrick Inc. #39
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.47911497
  • Longitude: -117.68502747

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,153.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 3,153.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 210.2
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 210.2

15-McGreevey Ranches #15    


  • Worksite Identifier: 15-McGreevey Ranches #15
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude:
  • Longitude:

ESU

    No ESU data was found for this worksite.

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 530.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 530.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 35.3
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 35.3

29-Scott Farms, Inc. #29    


  • Worksite Identifier: 29-Scott Farms, Inc. #29
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.53764269
  • Longitude: -117.79475822

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,000.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 5,000.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 333.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 333.0

31-Paul Weimer #31    


  • Worksite Identifier: 31-Paul Weimer #31
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.52721888
  • Longitude: -117.70386204

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 870.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 870.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 87.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 87.0

30-Scott Davis #30    


  • Worksite Identifier: 30-Scott Davis #30
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.52837886
  • Longitude: -117.43612178

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 918.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 918.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 30.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 30.0

8-Buddy Boyd #8    


  • Worksite Identifier: 8-Buddy Boyd #8
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.61096678
  • Longitude: -117.65868938

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 464.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 464.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 46.4
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 46.4

4-3W Farms #4    


  • Worksite Identifier: 4-3W Farms #4
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.65490029
  • Longitude: -117.51816423

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,080.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,080.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 208.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 208.0

16-Pat McKeirnan #16    


  • Worksite Identifier: 16-Pat McKeirnan #16
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.4926053
  • Longitude: -117.39882349

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,483.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,483.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 248.3
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 248.3

38-Ed Bishop #38    


  • Worksite Identifier: 38-Ed Bishop #38
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.61401199
  • Longitude: -117.46324776

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,018.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,018.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 80.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 80.0

2-Tom Herres #2    


  • Worksite Identifier: 2-Tom Herres #2
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.45397542
  • Longitude: -117.42870392

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 471.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 471.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 25.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 25.0

21-L. Koller Farms #21    


  • Worksite Identifier: 21-L. Koller Farms #21
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.64094025
  • Longitude: -117.61860627

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,025.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,025.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 102.5
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 102.5

13-Double S Farms #13    


  • Worksite Identifier: 13-Double S Farms #13
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.54936432
  • Longitude: -117.39016048

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 4,643.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 4,643.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 309.5
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 309.5

28-Scott Davis #28    


  • Worksite Identifier: 28-Scott Davis #28
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.52607476
  • Longitude: -117.42800823

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,217.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,217.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 121.7
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 121.7

40-Randy Kausche #40    


  • Worksite Identifier: 40-Randy Kausche #40
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.51564419
  • Longitude: -117.67530161

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 509.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 509.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 50.9
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 50.9

32-Max Scoggin #32    


  • Worksite Identifier: 32-Max Scoggin #32
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.34781507
  • Longitude: -117.50750787

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,125.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,125.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 75.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 75.0

37-Blachly & Sons #37    


  • Worksite Identifier: 37-Blachly & Sons #37
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.60746614
  • Longitude: -117.45664812

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,365.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,365.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 157.7
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 157.7

11-3 W Farms #11    


  • Worksite Identifier: 11-3 W Farms #11
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude:
  • Longitude:

ESU

    No ESU data was found for this worksite.

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 719.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 719.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 47.9
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 47.9

7-4 Aces #7    


  • Worksite Identifier: 7-4 Aces #7
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.659617
  • Longitude: -117.71652578

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 135.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 135.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 9.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 9.0

5-3W Farms #5    


  • Worksite Identifier: 5-3W Farms #5
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.65907707
  • Longitude: -117.50229778

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 412.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 412.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 41.2
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 41.2

35-John & Laura Dixon #35    


  • Worksite Identifier: 35-John & Laura Dixon #35
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.49055562
  • Longitude: -117.51190968

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,160.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,160.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 216.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 216.0

12-Randy Koller #12    


  • Worksite Identifier: 12-Randy Koller #12
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.55148569
  • Longitude: -117.39380733

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,165.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,165.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 116.5
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 116.5

19-R&G Ranches #19    


  • Worksite Identifier: 19-R&G Ranches #19
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.61759106
  • Longitude: -117.5543817

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 993.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 993.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 99.3
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 99.3

33-Dick Ledgerwood & Sons #33    


  • Worksite Identifier: 33-Dick Ledgerwood & Sons #33
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.46219208
  • Longitude: -117.38047532

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 188.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 188.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 25.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 25.0

3-McGreevy Ranches #3    


  • Worksite Identifier: 3-McGreevy Ranches #3
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.61684768
  • Longitude: -117.61879216

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 600.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 600.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 60.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 60.0

41-Ken Beale #41    


  • Worksite Identifier: 41-Ken Beale #41
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.50823262
  • Longitude: -117.37764353

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,043.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 1,043.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 69.5
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 69.5

27-Ken Beale #27    


  • Worksite Identifier: 27-Ken Beale #27
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.52423234
  • Longitude: -117.38060579

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,743.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 3,743.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 249.5
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 249.5

17-McGreevey Ranches #17    


  • Worksite Identifier: 17-McGreevey Ranches #17
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.47704858
  • Longitude: -117.47058343

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 3,870.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 3,870.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 258.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 258.0

9-McKeirnan Farms #9    


  • Worksite Identifier: 9-McKeirnan Farms #9
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude:
  • Longitude:

ESU

    No ESU data was found for this worksite.

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 2,943.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 2,943.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 294.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 294.0

24-Bruce & Les Lyle #24    


  • Worksite Identifier: 24-Bruce & Les Lyle #24
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.45031618
  • Longitude: -117.398918

ESU

    No ESU data was found for this worksite.

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 5,000.00
    •      . . C.0.b Length of stream treated/protected .00
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      The need to reduce upland soil erosion was identified in the Pataha Creek Model Watershed Plan, along with the Asotin and Tucannon Model watershed plans.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.6 Upland Habitat And Sediment ProjectY (Y/N)
      •      . . . . C.6.a Upland Habitat / Sediment Funding 5,000.00
      •      . . . . C.6.b.1 Acres of upland habitat area treated 500.0
      •      . . . . C.6.b.2 Miles of road treated in upland area .00
      •      . . . . C.6.i.1 Upland agriculture managementY (Y/N)
        •      . . . . . . C.6.i.2 Upland agriculture management action(s) taken (LOV)
        •      . . . . . . C.6.i.3 Upland acres managed for agriculture 500.0