00-1128 AR | - | 03/17/2000 | 06/30/2009 | 2000 | Completed | 04/12/2024 | |
| |
Description
South Fork Chinook purchased and restored some of the best remaining Chinook salmon habitat in the South Fork Nooksack. The project acquired 282 acres of riparian habitat along the last natural meandering reaches of the South Fork. Upstream of the project area the river flows in a narrow valley with few stable off channel sloughs. The Lummi Indian Nation, Department of Ecology (DOE), USFWS, and Whatcom Land Trust partnered in this project. Lummi Nation provided restoration and monitoring services. Whatcom Land Trust complete acquisitions and will hold properties.
Project Benefit
The goal of the project is to protect and improve instream morphology and habitat in salmon bearing streams. The objective of the project is to protect and increase instream cover, spawning, and resting areas.
The goal of the project is to protect and restore native riparian vegetation along salmon bearing streams. The objective of the project is to protect and restore natural streamside vegetation, improve stream temperature, reduce erosion, filtration, and recruit large woody debris.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.01 |
1.25 |
Land Acquisition |
Acres Acquired or Protected |
282.0 |
696.0 |
Stream Bank Miles Acquired
or Protected |
3.70 |
4.50 |
Riparian Habitat |
Stream Miles Treated |
.00 |
|
Acres Treated |
15.0 |
|
Funding Details |
State | $533,496 |
Other | $364,860 |
Report Total: | $898,356 |
|
| |
Worksites
2-Galbraith/Hellyer
- Worksite Identifier: 2-Galbraith/Hellyer
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.70523902
- Longitude: -122.17464494
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
n/a |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 5,727.57
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition .00
- . . . . . . C.10.c.6
Acres of land, wetland or estuarine area acquired .0
8-Skookum Creek Corridor
- Worksite Identifier: 8-Skookum Creek Corridor
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.67141318
- Longitude: -122.14159851
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
n/a |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 1,767.50
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
7-Hampton-Skookum Creek
- Worksite Identifier: 7-Hampton-Skookum Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.6700748
- Longitude: -122.14250056
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
n/a |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 6,679.20
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition .00
9-Catalyst Paper Company
- Worksite Identifier: 9-Catalyst Paper Company
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.70884188
- Longitude: -122.19751004
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
n/a |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 8,968.73
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition .00
5-Edfro Creek
- Worksite Identifier: 5-Edfro Creek
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.66099309
- Longitude: -122.12539983
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected 1.54
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
na |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 145,201.73
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition 1.10
- . . . . . . C.10.c.6
Acres of land, wetland or estuarine area acquired 128.0
3-Roos
- Worksite Identifier: 3-Roos
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.70689874
- Longitude: -122.18612425
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
na |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 207,289.60
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition .60
- . . . . . . C.10.c.6
Acres of land, wetland or estuarine area acquired 77.0
6-Port Blakely II
- Worksite Identifier: 6-Port Blakely II
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.67011598
- Longitude: -122.14360889
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
na |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
na |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 16,349.80
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition .00
- . . . . . . C.10.c.6
Acres of land, wetland or estuarine area acquired .0
4-Ewing
- Worksite Identifier: 4-Ewing
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.66987207
- Longitude: -122.1471656
ESU
No ESU data was found for this worksite.
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 2.00
- . . C.0.b
Length of stream treated/protected .00
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
na |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 1.00
- . . . . C.4.b
Total length of instream habitat treated .00
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 1.00
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated .0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
na |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 5,300.00
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition .00
1-Curtis
- Worksite Identifier: 1-Curtis
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 48.69773074
- Longitude: -122.17070839
ESU
- Puget Sound Steelhead DPS
- Puget Sound/Strait of Georgia Coho Salmon ESU
- Puget Sound Chinook Salmon ESU
- Puget Sound/Strait of Georgia Chum Salmon ESU
- Odd-year
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 275,393.43
- . . C.0.b
Length of stream treated/protected .31
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
na |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 10,171.16
- . . . . C.4.b
Total length of instream habitat treated .01
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .01
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 0
- . . . . . . C.4.d.7
Number of structures placed in channel 1
- . . . . C.4.e.1
Streambank stabilization Y (Y/N)
- . . . . . . C.4.e.2
Material Used For Streambank Stabilization (LOV)
- . . . . . . C.4.e.3
Miles of streambank stabilized .00
- . . C.5
Riparian Habitat ProjectY (Y/N)
- . . . . C.5.a
Riparian Habitat Funding 265,222.27
- . . . . C.5.b.1
Total riparian miles streambank treated .00
- . . . . C.5.b.2
Total Riparian Acres Treated 15.0
- . . . . C.5.h.1
Riparian plant removal/controlY (Y/N)
- . . . . . . C.5.h.2
Species of plants treated/removed in riparian | |
n/a |
- . . . . . . C.5.h.3
Acres of riparian treated for plant removal/control .0
- . . C.10
Land or Easement AcquisitionY (Y/N)
- . . . . C.10.a
Land acquisition funding 226,837.42
- . . . . C.10.b
Habitat treatments applied (LOV)
- . . . . C.10.c.1
Acquisition or lease of land, wetland or estuarine area for conservationY (Y/N)
- . . . . . . C.10.c.2
Type of acquisition to protect habitat (LOV)
- . . . . . . C.10.c.3
Type of property protected (LOV)
- . . . . . . C.10.c.4
Date of expiration of protection12/31/9999 (mm/dd/yyyy)
- . . . . . . C.10.c.5
Miles of streambank protected by land or easement acquisition 2.00
- . . . . . . C.10.c.6
Acres of land, wetland or estuarine area acquired 77.0
|
|