Mashel River Habitat Designs RM 0-3

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination Salmonid Habitat Assessment / Inventory
Project ID21-1032 P
Recovery Domains -
Start Date09/23/2021
End Date12/31/2023
Year2019
StatusOngoing
Last Edited04/12/2024
 
1 - 1

Description    


This proposal is for a design planning grant for two adjacent restoration areas at the mouth of the Mashel River, coupled with a reach-scale design alternatives for the lower three miles of the Mashel River. The location specific restoration designs will focus on two adjacent work areas near the mouth of the Mashel River where bridge abutments, bank armoring, and fill will be removed to restore floodplain and side channel connections, river migration corridors, and salmon habitat. Supplemental installations of in-stream wood (logs or log jams) to boost salmon habitat and mid-term wood loading are proposed as well. For the additional lower three miles of the Mashel River, a GIS and field assessment of in-stream habitat and wood loading conditions will inform design alternatives for wood loading treatments. Viable wood placement options for the reach-scale area will be developed into design documents which will be used to inform future project planning and funding strategies. Deliverables for this project will include a Preliminary Design for restoration and a report summarizing results of the assessment. The three landowners for the entirety of the project area are all state agencies, State Parks, UW Pack Forest, and WA DNR. Site access is expected to be granted for the design work, with future restoration access pending formal requests and agreement. This project will support Chinook, coho, chum, and pink salmon, and steelhead and trout species.

Project Benefit    


Restoration Goal 1: Increase the quantity and quality of accessible off-channel habitat for rearing, juvenile salmon and steelhead. Restoration Goal 2: Improve river channel and habitat diversity for juvenile and adult salmon and steelhead. Restoration Goal 3: Improve floodplain-river connections and functions. Assessment Goal 1: Assess and update metrics for current wood loading rates and habitat features within the lower three miles of the Mashel River. Develop designs for the site specific locations as well as for wood-loading projects in the lower three miles of the Mashel River.

Accomplishments

Metric Completed Originally
Proposed
Planning and Assessment
  Stream Miles Assessed 3.00

Funding Details

SourceFunds
PCSRF$169,832
State$46,168
Report Total:$216,000


Project Map



Worksites

1-Lower Mashel River Restorat    


  • Worksite Identifier: 1-Lower Mashel River Restorat
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.84422946
  • Longitude: -122.33246932

ESU

  • Puget Sound/Strait of Georgia Coho Salmon ESU
  • Puget Sound/Strait of Georgia Chum Salmon ESU
  • Puget Sound Steelhead DPS
  • Odd-year
  • Puget Sound Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented
      •      . . B.2 Salmonid Habitat Assessment / InventoryY (Y/N)
        •      . . . . B.2.a Habitat Assessment Funding
        •      . . . . B.2.c Instream SurveyY (Y/N)
          •      . . . . . . B.2.c.1 Type of instream survey (LOV)
          •      . . . . . . B.2.c.2 Stream miles assessed
          •      . . . . . . B.2.c.3 Stream miles assessed that contained salmonids
          •      . . . . . . B.2.c.4 Stream miles assessed that needed restoration
          •      . . . . . . B.2.c.5 Stream miles assessed for regulatory actions
          •      . . . . . . B.2.c.6 Fish passage impediments identified
        •      . . . . B.2.d Habitat surveysY (Y/N)
          •      . . . . . . B.2.d.1 Type of habitat survey/assessment (LOV)
          •      . . . . . . B.2.d.2 Amount of habitat assessed
          •      . . . . . . B.2.d.3 Amount of habitat assessed that needed restoration