Barnaby Reach Phase 2 Design

Salmonid Restoration Planning and Assessments

Restoration Planning And Coordination
Project ID20-1382 P
Recovery Domains -
Start Date09/16/2020
End Date06/30/2024
Year2020
StatusOngoing
Last Edited04/12/2024
 
1 - 1

Description    


The project proposes to complete preliminary design and initiate permitting for the second phase of restoration in the Barnaby Reach, which will restore fish passage and flow conditions to the Harrison Slough complex. This will be accomplished by diverting Illabot Creek through an historic channel connecting to Upper Harrison Slough, which flows out Harrison Pond and Lucas Slough to the Skagit River, as well as removing culverts along Upper Harrison Slough, levees along the northern portion of Harrison Pond, and the dike and fishway at the mouth of Harrison Pond, which has been identified as a barrier to fish passage. A new bridge over Illabot Creek near the diversion will provide necessary access to private property. This project would extend the length of lower Illabot Creek by approximately 3.4 miles, and provide a diversity of habitat types that would benefit a range of salmonid species and life stages. The preliminary design work will build on ongoing work such as streamflow monitoring, topographic surveys, an existing conditions habitat analysis, and extensive outreach. Hydraulic modeling is currently underway to address additional design questions. Preliminary design deliverables will include a basis of design report, cut profiles and quantities, construction approach, a preliminary cost estimate and drawing package for the development of permits.

Project Benefit    


The goal of this project is to restore natural floodplain process and improve off-channel habitat conditions to benefit Chinook salmon and other species within the Barnaby Reach of the Skagit River.

Accomplishments

Metric Completed Originally
Proposed

Funding Details

SourceFunds
PCSRF$463,926
Other$81,900
Report Total:$545,826


Project Map



Worksites

1-Illabot/Harrison    


  • Worksite Identifier: 1-Illabot/Harrison
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 48.49164773
  • Longitude: -121.53042579

ESU

  • Puget Sound/Strait of Georgia Coho Salmon ESU
  • Puget Sound/Strait of Georgia Chum Salmon ESU
  • Puget Sound Steelhead DPS
  • Odd-year
  • Puget Sound Chinook Salmon ESU

Map

Photos

Metrics

Metrics
  • B.0 Salmonid Restoration Planning and AssessmentsY (Y/N)
    •      . . B.0.a Planning And Assessment Funding
    •      . . B.0.b.1 Area Encompassed
    •      . . B.0.b.2 Stream Miles Affected
    •      . . B.1 Restoration Planning And CoordinationY (Y/N)
      •      . . . . B.1.a Planning and Coordination funding
      •      . . . . B.1.b.11 Engineering/design work for restoration projectsY (Y/N)
        •      . . . . . . B.1.b.11.a
          Name of plan implemented
        •      . . . . . . B.1.b.11.b
          Description and scope of the plan implemented