Grays Harbor Juvenile Fish Use Assessment 2012
Salmonid Restoration Planning and Assessments
|
12-1410 P | - | 12/06/2012 | 09/25/2014 | 2012 | Completed | 04/12/2024 | |
| |
Description
This project continued our ongoing work of nearshore habitat use patterns of juvenile salmonids in the Grays Harbor Estuary. Wild Fish Conservancy staff sampled at least 30 sites throughout Grays Harbor twice per month from March through September. Sample sites were spread throughout the estuary in order to better capture the usage of the entire estuary, but targeted locations where habitat restoration and protection projects could potentially be sited. WFC will continued to sample in the locations identified in our annual study plan, developed with assistance from the Chehalis Basin Habitat Work Group. In addition to fish usage data, WFC staff took Coded Wire Tag readings, genetic fin clips of chinook, and collected relevant physical habitat parameters and water quality data in order to determine how these variables might be driving habitat usage within the estuary. An outcome of this project includes a report that suggests habitat restoration and protection actions based on the data collected over the course of the project. WFC will initiated the project in March of 2013 and continue through September of 2013. The report from the first two years of data collection was finished in the spring of 2013.
Project Benefit
The goal is to understand the extent, timing, and species composition of fish usage in the Grays Harbor estuary. The objectives are to examine current nearshore habitat usage patterns of juvenile salmonids in the Grays Harbor Estuary. Wild Fish Conservancy staff will sample at least 30 sites throughout Grays Harbor twice per month from February through September.
Funding Details |
PCSRF | $204,341 |
Other | $31,941 |
In-Kind Volunteers | $15,546 |
Report Total: | $251,828 |
|
| |
Worksites
1-Grays Harbor
- Worksite Identifier: 1-Grays Harbor
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 46.95568368
- Longitude: -124.02934705
ESU
- Pacific Coast Chum Salmon ESU
- Southwest Washington Steelhead DPS
- Washington Coast Chinook Salmon ESU
- Southwest Washington Coho Salmon ESU
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 251,828.00
- . . B.0.b.1
Area Encompassed 25,600.0
- . . B.0.b.2
Stream Miles Affected .00
- . . B.2
Salmonid Habitat Assessment / InventoryY (Y/N)
- . . . . B.2.a
Habitat Assessment Funding 251,828.00
- . . . . B.2.d
Habitat surveysY (Y/N)
- . . . . . . B.2.d.1
Type of habitat survey/assessment (LOV)
- . . . . . . B.2.d.2
Amount of habitat assessed 15.0
- . . . . . . B.2.d.3
Amount of habitat assessed that needed restoration .0
|
|