Wisen Creek & Tributary Stream Crossing Designs x3
Salmonid Restoration Planning and Assessments
|
19-1521 P | - | 12/12/2019 | 06/12/2022 | 2019 | Completed | 05/03/2024 | |
| |
Description
This project completed final engineered designs for three fish passage culvert barrier sites in the Wisen Creek Watershed. To complete the final designs the project team completed site surveys, cultural resources compliance, preliminary designs, geotech investigation, final design deliverables, and secured permits. The project was completed in collaboration with Clallam County Public Works staff, with support from Quileute Tribe staff and WDFW staff. The project secured a six month extension (related to geotech analysis delays) to complete the project.
Project Benefit
The goal of this project is to produce final, construction-ready designs for all three road crossing fish barriers to increase the quantity and quality of accessible spawning and rearing habitat for coho, steelhead, and trout species. The designs will be engineered to accommodate increased peak flows anticipated from climate change and allow for natural sediment, wood, and nutrient transport. Creating these construction-ready designs and contract packages will accelerate their replacement when funding becomes available.
Funding Details |
State | $63,397 |
In-Kind Donated Labor | $5,954 |
In-Kind Other | $8,416 |
Report Total: | $77,766 |
|
| |
Worksites
1-Wisen Creek and Tributary B
- Worksite Identifier: 1-Wisen Creek and Tributary B
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State: Washington
- Recovery Domain:
- Latitude: 48.06364924
- Longitude: -124.16126241
ESU
- Olympic Peninsula Coho Salmon ESU
- Olympic Peninsula Steelhead DPS
Map
Photos
Metrics
Metrics
- B.0
Salmonid Restoration Planning and AssessmentsY (Y/N)
- . . B.0.a
Planning And Assessment Funding 77,766.00
- . . B.0.b.1
Area Encompassed 1.0
- . . B.0.b.2
Stream Miles Affected .10
- . . B.1
Restoration Planning And CoordinationY (Y/N)
- . . . . B.1.a
Planning and Coordination funding 77,766.00
- . . . . B.1.b.11
Engineering/design work for restoration projectsY (Y/N)
- . . . . . . B.1.b.11.a
Name of plan implemented | |
North Pacific Coast Lead Entity for Salmon Recovery, 2019, North Pacific Coast (WRIA 20) Salmon Restoration Strategy, University of WA, Olympic Natural Resource Center, PO Box 1623, Forks, WA |
- . . . . . . B.1.b.11.b
Description and scope of the plan implemented | |
The Wisen Creek Culvert Replacements Project is noted as “high Priority” on the Lead Entity Project List, and it is noted as a “priority project” in the body of the Strategy document referenced above. |
|
|