Increase Wood Densities in Asotin IMW Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID19-1499 R
Recovery Domains -
Start Date12/12/2019
End Date05/18/2022
Year2019
StatusCompleted
Last Edited04/12/2024
 
1 - 1

Description    


The Asotin Creek Intensively Monitored Watershed project (Asotin IMW) has been running since 2008 with the goal to test the effectiveness of low-tech process-based restoration structures at improving riverscape health and summer steelhead productivity. The project is coordinated by the Snake River Salmon Recovery Board and funded by the Pacific States Marine Fisheries Commission.

Restoration on the Charley Creek site was completed in both 2020 and 2021, resulting in .93 miles of new treatment area that included 37 new structures, 2 existing structures enhanced, and 10 trees felled into the stream.

South Fork Asotin Creek was also treated in both 2020 and 2021, resulting in 2.18 miles of new treatment area that included 66 new structures, enhancement of 132 existing structures and 14 trees felled.

There was a delay securing permits and a cultural survey to work in the North Fork, which limited restoration work to one work window. Efforts on the North Fork took place in 2021 and resulted in 1.24 miles of new treatment area. There were 17 new structures and enhancement of 22 existing structures. 14 trees were also fell.

Project Benefit    


Increase woody density in existing Asotin Intensively Monitored Watershed restoration treatments to continue improving channel complexity and force more floodplain connection to increase Snake River steelhead freshwater productivity. 

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated 4.35 6.20

Funding Details

SourceFunds
State$32,500
In-Kind Donated Labor$5,840
In-Kind Other$7,000
Report Total:$45,340


Project Map



Worksites

1-Charley Creek river mile 2.    


  • Worksite Identifier: 1-Charley Creek river mile 2.
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.28616703
  • Longitude: -117.30971798

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 23,228.75
    •      . . C.0.b Length of stream treated/protected .93
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 23,228.75
      •      . . . . C.4.b Total length of instream habitat treated .93
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .93
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 6
        •      . . . . . . C.4.d.7 Number of structures placed in channel 47

3-South Fork Asotin Creek Riv    


  • Worksite Identifier: 3-South Fork Asotin Creek Riv
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.25580703
  • Longitude: -117.29208097

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 21,024.00
    •      . . C.0.b Length of stream treated/protected 2.18
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 21,024.00
      •      . . . . C.4.b Total length of instream habitat treated 2.18
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 2.18
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 30
        •      . . . . . . C.4.d.7 Number of structures placed in channel 80

2-North Fork Asotin Creek Riv    


  • Worksite Identifier: 2-North Fork Asotin Creek Riv
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin:
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State:
  • Recovery Domain:
  • Latitude: 46.25673303
  • Longitude: -117.30076697

ESU

  • Snake River Basin Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 1,086.98
    •      . . C.0.b Length of stream treated/protected 1.24
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 1,086.98
      •      . . . . C.4.b Total length of instream habitat treated 1.24
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement 1.24
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 9
        •      . . . . . . C.4.d.7 Number of structures placed in channel 31