Leland - Whitney Creek R7
Salmonid Habitat Restoration and Acquisition
|
09-1554 R | - | 10/06/2009 | 03/08/2011 | 2008 | Completed | 04/12/2024 | |
| |
Description
This project replacd two barrier culverts (4’ and 3.5’ dia) with a prefabricated, modular, concrete bridge to eliminate hydraulic drops associated with both culverts. The project site is on Whitney Creek, a tributary to the Wolf Fork, which is a North Fork Touchet River tributary. Both pipes at the site were installed as a result of flooding in the late 1990s under a county-wide emergency proclamation. No HPA was required then. The low flow pipe had a 1.7 foot inlet drop (due to debris accumulation), a 0.8 foot outlet drop, and a slope of 6.5%. The high flow pipe had an outlet drop of 1.5 feet and a slope of 7.3%. Both pipes were replaced with a 25 foot long and 15 foot wide bridge, opening up about 2.22 miles of stream for steelhead, rainbow and potentially bull trout (presumed present).
Project Benefit
The goal of the project is to connect isolated habitat to increase the range and distribution of salmon.
The objective of the project is to increase access to areas blocked by human-caused impediments.
Accomplishments
Fish Passage |
Barriers Removed |
|
|
Miles Opened |
2.22 |
2.22 |
Funding Details |
State | $157,632 |
Report Total: | $157,632 |
|
| |
Worksites
1-Leland Fish Barrier
- Worksite Identifier: 1-Leland Fish Barrier
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin:
- Subbasin:
- Watershed:
- Subwatershed:
- State:
- Recovery Domain:
- Latitude: 46.16493567
- Longitude: -117.85774037
ESU
- Middle Columbia River Steelhead DPS
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 157,632.25
- . . C.0.b
Length of stream treated/protected 2.22
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
None |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.2
Fish Passage ImprovementY (Y/N)
- . . . . C.2.a
Fish Passage Funding 157,632.25
- . . . . C.2.b.1
Length of stream made accessible 2.22
- . . . . C.2.b.3
Type of blockage/barrier (LOV)
- . . . . C.2.b.4
Number of blockages/impediments/barriers impeding passage 1
- . . . . C.2.g.1
Bridge installed or improved at road stream crossingY (Y/N)
- . . . . . . C.2.g.2
Number of bridges installed or improved/upgraded 1
- . . . . . . C.2.g.3
Miles of stream made accessible by bridge installation or improvement/upgrade 2.22
|
|