Makah FY 2022 Lake Ozette Sockeye Smolt Calcein Marking and Monitoring

Salmonid Research, Monitoring, and Evaluation (RM&E)

Monitoring
Project ID22HR R-6
Recovery DomainsOzette Lake
Start Date07/01/2024
End Date06/30/2025
Year2022
StatusNew
Last Edited02/27/2024
 
1 - 1

Description    


This project will support the operation of a rotary screw smolt trap during the sockeye smolt out-migration from April to July, in calendar year 2024 or 2025 to detect calcein marks. Trap efficiency (TE) trials will be conducted throughout the smolt out-migration period using 100 smolts with alternating caudal or ventral fin clips per trial. Fork length measurements and calcein mark status will be recorded for all TE smolts prior to mark application. TE trial smolts will be acclimated in a net pen and transported 2 miles upstream and released into Lake Ozette near the Rayonier landing to facilitate a more natural out-migration pattern so their susceptibility to recapture remains similar to natural migrants. The results from the trap efficiency trials will be used to expand trap counts to estimate total smolt abundance.

Project Benefit    


Calcein marking and monitoring project will allow the Makah Tribe to non-lethally determine HOR and NOR contributions to the outmigration.

Accomplishments

Metric Completed Originally
Proposed
Research and Monitoring
  Stream Miles Monitored 23.30

Funding Details

SourceFunds
PCSRF$56,842
Report Total:$56,842


Project Map



Worksites

52040341    


  • Worksite Identifier: 52040341
  • Start Date:
  • End Date:
Area Description

No Area Description data was found for this worksite.

Location Information

  • Basin: Washington Coastal (171001)
  • Subbasin: Hoh-Quillayute (17100101)
  • Watershed: Ozette Lake-Frontal Pacific Ocean (1710010102)
  • Subwatershed: Ozette Lake (171001010204)
  • State: Washington
  • Recovery Domain: Ozette Lake
  • Latitude: 48.1251
  • Longitude: -124.6336

ESU

  • Ozette Lake Sockeye Salmon ESU

Map

Photos

Metrics

Metrics
  • E.0 Salmonid Research, Monitoring, and Evaluation (RM&E)Y (Y/N)
    •      . . E.0.a RM&E Funding .00
    •      . . E.0.b
      Complement habitat restoration project
    •      . . E.0.c
      Project identified in a plan or watershed assessment.
    •      . . E.0.d.1 Number of Cooperating Organizations
    •      . . E.0.d.2
      Name Of Cooperating Organizations.
    •      . . E.1 MonitoringY (Y/N)
      •      . . . . E.1.a Monitoring funding
      •      . . . . E.1.b.1 Stream Miles Monitored
      •      . . . . E.1.b.2 Acres of Watershed Area Monitored
      •      . . . . E.1.b.3 Square miles of water monitored (Square miles)
      •      . . . . E.1.c.2 Salmonid smolt or fry monitoringY (Y/N)
        •      . . . . . . E.1.c.2.a # miles (to nearest 0.01 mile) monitored for Salmonid smolt or fry
        •      . . . . E.1.d
          Name Of Comprehensive Monitoring Strategy/Program