FY 2022 Stillaguamish Manufacture and Installation of Netting Supports of Outside Tanks at Brenner Creek Hatchery
Salmonid Hatcheries and Harvest Management
|
22HR E-4 | Puget Sound | 09/25/2023 | 02/27/2024 | 2022 | Completed | 06/27/2024 | |
| |
Description
The project supported the installation of support structures for nets to cover six outdoor rearing tanks at the Tribes Brenner Creek Hatchery.
Project Benefit
The netted tanks will prevent the loss of fish to birds and other predators, and from fish leaping out of the tanks. The nets will also reduce the accumulation of debris, e.g., leaves, in the tanks.
Funding Details |
PCSRF | $9,767 |
Report Total: | $9,767 |
|
| |
Worksites
52038945
- Worksite Identifier: 52038945
- Start Date:
- End Date:
Area Description
No Area Description data was found for this worksite.
Location Information
- Basin: Puget Sound (171100)
- Subbasin: Stillaguamish (17110008)
- Watershed: South Fork Stillaguamish River (1711000802)
- Subwatershed: Lower South Fork Stillaguamish River (171100080207)
- State: Washington
- Recovery Domain: Puget Sound
- Latitude: 48.097506
- Longitude: -122.004084
ESU
- Puget Sound Chinook Salmon ESU
Map
Photos
Metrics
Metrics
- D.0
Salmonid Hatcheries and Harvest ManagementY (Y/N)
- . . D.0.a
Hatchery and harvest mgmt. funding 9,767.00
- . . D.0.b
Complement habitat restoration project | |
None. |
- . . D.0.c
Project Identified in a plan or watershed assessment. | |
None. |
- . . D.1
Hatchery Production ProjectY (Y/N)
- . . . . D.1.a
Hatchery Production Funding 9,767.00
- . . . . D.1.c.1
Hatchery operations - facility or equipmentY (Y/N)
- . . . . . . D.1.c.2
Description of the facility modification and/or equipment purchase | |
Project entailed the installation of support structures for nets to cover six outdoor rearing tanks. Once nets are in place they will prevent the loss of fish to birds and other predators, and from fish leaping out of the tanks. The nets will also reduce the accumulation of debris in the rearing tanks. |
- . . . . . . D.1.c.3
Funding for facility equipment or structures 9,767.00
|
|