James Creek Coho Stream Habitat Enhancement Project

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID725165
Recovery DomainsN Central California Coast
Start Date06/01/2017
End Date01/13/2021
Year2016
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


28 features containing 93 pieces of properly sized LWD were installed in James Creek to improve the quality and quantity of spawning and rearing habitat for Coho and Steelhead on 0.88 miles of James Creek. All FY14 funds were spent within the appropriate award window.

Project Benefit    


Spawning habitat and escape cover will be improved with additional large woody debris structures.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .88 .14

Funding Details

SourceFunds
PCSRF$173,133
In-Kind Donated Labor$65,316
In-Kind Other$46,230
Report Total:$284,679


Project Map



Worksites

7211365    


  • Worksite Identifier: 7211365
  • Start Date:
  • End Date:
Area Description
James Creek

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin: Big-Navarro-Garcia (18010108)
  • Watershed: Big River (1801010803)
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 39.35285
  • Longitude: -123.51032

ESU

  • California Coastal Chinook Salmon ESU
  • Northern California Steelhead DPS
  • Central California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 284,680.00
    •      . . C.0.b Length of stream treated/protected .88
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Downie, S., B. deWaard, E. Dudik, D. McGuire, and R. Rutland. 2006. Big River Basin Assessment Report. North Coast Watershed Assessment Program. California Resources Agency, and California Environmental Protection Agency, Sacramento, California.
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 284,680.00
      •      . . . . C.4.b Total length of instream habitat treated .88
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .88
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 0
        •      . . . . . . C.4.d.7 Number of structures placed in channel 28