Kelly Gulch Fisheries and Riparian Habitat Enhancement Phase II

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID725164
Recovery DomainsN CA - S Oregon
Start Date07/12/2017
End Date04/26/2021
Year2016
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


The project restores floodplain habitat for all salmonid life stages by constructing large wood structures, off channel pond and alcove, and side channels with wood features. All FY13 and FY14 funds were spent within their appropriate award windows.

Project Benefit    


Floodplain habitat enhancements of side channel, alcoves and off channel ponds for improved winter and summer refugia. Improved spawning habitat.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .55 .20

Funding Details

SourceFunds
PCSRF$511,613
State$9,151
In-Kind Donated Labor$7,350
In-Kind Other$3,140
Report Total:$531,254


Project Map



Worksites

7211387    


  • Worksite Identifier: 7211387
  • Start Date:
  • End Date:
Area Description
Kelly Gulch

Location Information

  • Basin: Klamath (180102)
  • Subbasin: Salmon (18010210)
  • Watershed: North Fork Salmon River (1801021002)
  • Subwatershed:
  • State: California
  • Recovery Domain: N CA - S Oregon
  • Latitude: 41.315324
  • Longitude: -123.168527

ESU

  • Upper Klamath / Trinity Rivers Chinook Salmon ESU
  • Southern Oregon/Northern California Coast Coho Salmon ESU
  • Klamath Mountains Province Steelhead DPS

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 531,254.00
    •      . . C.0.b Length of stream treated/protected .55
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      SONCC Coho Recovery Plan, task: SONCC-SalR.2.1.8.2
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 531,254.00
      •      . . . . C.4.b Total length of instream habitat treated .55
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .34
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .21
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity .5
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 0
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .55
        •      . . . . . . C.4.d.4 Acres of streambed treated through channel structure placement .3
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 17
        •      . . . . . . C.4.d.7 Number of structures placed in channel 19