McKee Creek Instream Habitat Restoration

Salmonid Habitat Restoration and Acquisition

Instream Habitat
Project ID724742
Recovery DomainsN Central California Coast
Start Date06/01/2016
End Date03/15/2020
Year2015
StatusCompleted
Last Edited01/25/2024
 
1 - 1

Description    


The Project is comprised of 27 structures consisting of approximately 71 logs or LWD, 103 boulders, and 160 tons of small rock and cobble constructed within a total of 2100 feet of McKee Creek. The structures consist of 6 pool habitat and scour structures, 10 log weir structures, 6 boulder weir structures, and 3 unanchored LWD structures.

Project Benefit    


The project will increase instream habitat complexity and shelter values by providing increased cover and shade habitat in existing pools.

Accomplishments

Metric Completed Originally
Proposed
Instream Habitat
  Stream Miles Treated .15 .40

Funding Details

SourceFunds
PCSRF$197,486
Other$173,459
Report Total:$370,945


Project Map



Worksites

7210997    


  • Worksite Identifier: 7210997
  • Start Date:
  • End Date:
Area Description
McKee Instream

Location Information

  • Basin: Northern California Coastal (180101)
  • Subbasin:
  • Watershed:
  • Subwatershed:
  • State: California
  • Recovery Domain: N Central California Coast
  • Latitude: 40.0611
  • Longitude: -123.9628

ESU

  • California Coastal Chinook Salmon ESU
  • Northern California Steelhead DPS
  • Southern Oregon/Northern California Coast Coho Salmon ESU

Map

Photos

Metrics

Metrics
  • C.0 Salmonid Habitat Restoration and AcquisitionY (Y/N)
    •      . . C.0.a Habitat restoration and acquisition funding 370,946.00
    •      . . C.0.b Length of stream treated/protected .15
    •      . . C.0.c
      Project identified in a Plan or Watershed Assessment
      Downie, Davenport, Dudik, Yee, Clements, 2003, Mattole River Watershed Assessment Report, North Coast Watershed Assessment Program, California Resources Agency, California Environmental Protection Agency, Sacramento, CA
    •      . . C.0.d.1 Project Monitoring (LOV)
    •      . . C.0.d.2 Monitoring Location (LOV)
    •      . . C.4 Instream Habitat ProjectY (Y/N)
      •      . . . . C.4.a Instream Habitat Funding 370,946.00
      •      . . . . C.4.b Total length of instream habitat treated .15
      •      . . . . C.4.c.1 Channel reconfiguration and connectivityY (Y/N)
        •      . . . . . . C.4.c.2 Type of change to channel configuration and connectivity (LOV)
        •      . . . . . . C.4.c.3 Miles of stream treated for channel reconfiguration and connectivity .15
        •      . . . . . . C.4.c.4 Miles of off-channel stream created through channel reconfiguration and connectivity .00
        •      . . . . . . C.4.c.5 Acres of off-channel or floodplain connected through channel reconfiguration and connectivity 1,320.0
        •      . . . . . . C.4.c.6 Instream pools created/added through channel reconfiguration and connectivity 6
      •      . . . . C.4.d.1 Channel structure placementY (Y/N)
        •      . . . . . . C.4.d.2 Material used for channel structure (LOV)
        •      . . . . . . C.4.d.3 Miles of stream treated through channel structure placement .15
        •      . . . . . . C.4.d.5 Pools expected to be created through channel structure placement 6
        •      . . . . . . C.4.d.7 Number of structures placed in channel 27