McKee Creek Instream Habitat Restoration
Salmonid Habitat Restoration and Acquisition
|
724742 | N Central California Coast | 06/01/2016 | 03/15/2020 | 2015 | Completed | 01/25/2024 | |
| |
Description
The Project is comprised of 27 structures consisting of approximately 71 logs or LWD, 103 boulders, and 160 tons of small rock and cobble constructed within a total of 2100 feet of McKee Creek. The structures consist of 6 pool habitat and scour structures, 10 log weir structures, 6 boulder weir structures, and 3 unanchored LWD structures.
Project Benefit
The project will increase instream habitat complexity and shelter values by providing increased cover and shade habitat in existing pools.
Accomplishments
Instream Habitat |
Stream Miles Treated |
.15 |
.40 |
Funding Details |
PCSRF | $197,486 |
Other | $173,459 |
Report Total: | $370,945 |
|
| |
Worksites
7210997
- Worksite Identifier: 7210997
- Start Date:
- End Date:
Area Description
McKee Instream
Location Information
- Basin: Northern California Coastal (180101)
- Subbasin:
- Watershed:
- Subwatershed:
- State: California
- Recovery Domain: N Central California Coast
- Latitude: 40.0611
- Longitude: -123.9628
ESU
- California Coastal Chinook Salmon ESU
- Northern California Steelhead DPS
- Southern Oregon/Northern California Coast Coho Salmon ESU
Map
Photos
Metrics
Metrics
- C.0
Salmonid Habitat Restoration and AcquisitionY (Y/N)
- . . C.0.a
Habitat restoration and acquisition funding 370,946.00
- . . C.0.b
Length of stream treated/protected .15
- . . C.0.c
Project identified in a Plan or Watershed Assessment | |
Downie, Davenport, Dudik, Yee, Clements, 2003, Mattole River Watershed Assessment Report, North Coast Watershed Assessment Program, California Resources Agency, California Environmental
Protection Agency, Sacramento, CA |
- . . C.0.d.1
Project Monitoring (LOV)
- . . C.0.d.2
Monitoring Location (LOV)
- . . C.4
Instream Habitat ProjectY (Y/N)
- . . . . C.4.a
Instream Habitat Funding 370,946.00
- . . . . C.4.b
Total length of instream habitat treated .15
- . . . . C.4.c.1
Channel reconfiguration and connectivityY (Y/N)
- . . . . . . C.4.c.2
Type of change to channel configuration and connectivity (LOV)
- . . . . . . C.4.c.3
Miles of stream treated for channel reconfiguration and connectivity .15
- . . . . . . C.4.c.4
Miles of off-channel stream created through channel reconfiguration and connectivity .00
- . . . . . . C.4.c.5
Acres of off-channel or floodplain connected through channel reconfiguration and connectivity 1,320.0
- . . . . . . C.4.c.6
Instream pools created/added through channel reconfiguration and connectivity 6
- . . . . C.4.d.1
Channel structure placementY (Y/N)
- . . . . . . C.4.d.2
Material used for channel structure (LOV)
- . . . . . . C.4.d.3
Miles of stream treated through channel structure placement .15
- . . . . . . C.4.d.5
Pools expected to be created through channel structure placement 6
- . . . . . . C.4.d.7
Number of structures placed in channel 27
|
|